Wire new HVAC Mini-split unit.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
*mechanical permit is required prior to work*Town of Simsbury · 2026$1,000
Wiring new HVAC system
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed
1.Any and all electrical work is to follow all applicable sections of the 2022 State of Connecticut Building and 2020 NFPA 70 National Electrical Code.Town of Simsbury · 2026$1,000
Electrical WiringTown of Simsbury · 2026
Electrical WiringTown of Simsbury · 2026
WIRE NEW BATHROOM IN BASEMENT
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. CO Detectors per IRC for alterations, repairs and additions. R315.2.2Town of Simsbury · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$1,500
Electrical WiringTown of Simsbury · 2026
Install new recessed lights and ceiling fan in living room. Install new outlets at fireplace for portable electric fireplace and TV
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Arc fault protection shall be required. 210.12
2. C/O detection per IRC 315.2.2Town of Simsbury · 2026$1,600
Electrical WiringTown of Simsbury · 2026
WIRE NEW HVAC MINI-SPLIT SYSTEM
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. CO detectors are required on every floor level. IRC R315.2.2Town of Simsbury · 2026$1,000
Electrical WiringTown of Simsbury · 2026
Insatll subpanel in the garage using existing wiring for EV charger outlet. Wire new HVAC mini-split & install outdoor GFI service outlet. Re-install EV charger outlet.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. C/O detection in compliance with IRC 315.2.2
2.Any and all electrical work is to follow all applicable sections of the 2022 State of Connecticut Building and 2020 NFPA 70 National Electrical Code.Town of Simsbury · 2026$1,200
Permitted projects on public record. Addresses are omitted for privacy.