Remove and dispose of existing oil tank. Install new Roth 275 gallon double walled oil tank in same location as existing. New fill, vent alarm, gauge and associated piping. New envirotube sleeved oil line with a tigerloop ultra.Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections.Town of Simsbury · 2026
Remove and dispose of existing oil tank. Install new Roth 275 gallon double walled oil tank in same location as existing. New fill, vent alarm, gauge and associated piping. New envirotube sleeved oil line with a tigerloop ultra.Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections.
1. Installation shall comply with the manufactures spec. M1401.1
2. Upload manufacturers install instructionsTown of Simsbury · 2026$6,318
install a new 220 volt dedicated circuit from the electrical panel to a surge protector disconnect near the condenser. a new outlet plug will be installed outside near the disconnect.Town of Simsbury · 2026
install a new 220 volt dedicated circuit from the electrical panel to a surge protector disconnect near the condenser. a new outlet plug will be installed outside near the disconnect.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1.Any and all electrical work is to follow all applicable sections of the 2022 State of Connecticut Building and 2020 NFPA 70 National Electrical Code.Town of Simsbury · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
We will renovate 2 bathrooms, including moving the wet wall and vanity lines.Town of Simsbury · 2026
We will renovate 2 bathrooms, including moving the wet wall and vanity lines.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections.Town of Simsbury · 2026$1,500
replace existing shower valve with new in same location
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections.Town of Simsbury · 2026$500
replace existing shower valve with new in same locationTown of Simsbury · 2026
We will install a new 30K BTU Mitsubishi non-hyper heat pump condenser (#MXZ-4D30NL) on a mini-split stand outside the home. New AC piping and wiring will enter the home and connect to a new 18K BTU air handler #SVZ-AP18NL that will be installed to serve the first floor. New ductwork will be run with supplies and returns to feed the rooms. All ductwork will be wrapped and sealed to code. We will install 2 new 6K BTU indoor highwall units #MSZ-GX06NL, one in each second-floor bedroom. A new 220-volt dedicated circuit will be run from the electrical panel to a surge protector disconnect near the condenser. A new outlet plug will be installed outside near the disconnect.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Indoor wall unit is required to have a water sensor on condensate pan. This can either be built in unit or a separate device. IRC M1411.3.1.1
2. Heating and cooling equipment and appliances are to be sized to meet supplied heat loss report. Along with follow ACCA Manual S or Manual J methodologies calculations. IRC M1401.3
3. Appliance installation is to follow all manufacturer’s instructions. IRC M1401.1
4. Separate electrical permit is to be applied for. IRC R105.1
Zoning approval based on the following:
1. A final zoning inspection is required once the unit is installed.
2. No changes to location can be made without zoning approval.Town of Simsbury · 2026$29,269
We will install a new 30K BTU Mitsubishi non-hyper heat pump condenser (#MXZ-4D30NL) on a mini-split stand outside the home. New AC piping and wiring will enter the home and connect to a new 18K BTU air handler #SVZ-AP18NL that will be installed to serve the first floor. New ductwork will be run with supplies and returns to feed the rooms. All ductwork will be wrapped and sealed to code. We will install 2 new 6K BTU indoor highwall units #MSZ-GX06NL, one in each second-floor bedroom. A new 220-volt dedicated circuit will be run from the electrical panel to a surge protector disconnect near the condenser. A new outlet plug will be installed outside near the disconnect.Town of Simsbury · 2026
Will remove the unused hanging wires where the walls were removed. We will install 10 equally spaced 4' LED strip lights and connect to the switch at the top of the stairs. We will separate the power for the microwave, the toaster, and the clothes iron to help stop the circuit breaker from tripping.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Pending a Building permit for the wall removal R105.1
2.Any and all electrical work is to follow all applicable sections of the 2022 State of Connecticut Building and 2020 NFPA 70 National Electrical Code.Town of Simsbury · 2026$5,772
Will remove the unused hanging wires where the walls were removed. We will install 10 equally spaced 4' LED strip lights and connect to the switch at the top of the stairs. We will separate the power for the microwave, the toaster, and the clothes iron to help stop the circuit breaker from tripping.Town of Simsbury · 2026