FULL REMODEL OF DISTRESSED PROPERTY, FULL KITCHEN REMODEL, POWDER ROOM, UPSTAIRS MASTER AND GUEST BATHROOM, LIGHTING, FLOORING, PAINT, ADDING STRUCTURAL TRIPLE LVL WITH POSTING TO BASEMENT PIERS. LOWER LEVEL POWDER ROOM INSTALLATION WITH LIBERTY TANK AND ALARM, NEW CABLE RAILING SYSTEM WITH GRASPABLE RAILS. UPDATE SMOKE ALARMS, INSTALL CONDUIT AND WIRE FOR A TESLA EV CHARGER IN GARAGE (NO ACCESS INTO GARAGE DIRECTLY FROM HOME, BUT IT IS ATTACHED TO THE BUILDING, WE ARE THE BAY FARTHEST FROM THE UNIT, GARAGES ARE A WOOD TRUSS SYSTEM WITH NO SHEETROCK ON CEILINGS, WE INTEND TO GET NEIGHBOR APPROVAL TO WORK IN THE TRUSSES RUNNING THE CONDUIT ABOVE THEIR UNIT TO PULL WIRE TO OUR GARAGE BAY, EV CHARGER UNIT WILL HAVE A SMALL SUB PANEL WITH DISCONNECT. ADDITIOANLLY, WE INTEND TO SHEETROCK OUR GARAGE CEILING IF APPROVED BY THE ASSOCIATION FOR FIRE PROTECTION AND THEFT.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1 Provide Smoke and CO Detectors per IRC for alterations and additions. IRC R314.2.2, R315.2.2
2.Separate Electrical, Plumbing, and Mechanical permits are to be applied for. IRC R105.1
3.Kitchen design shall be uploaded prior to rough inspections.
4. If the design change involves a new island or peninsula please provide a review of floor joists at new peninsula with stone countertop for support of live and dead loads. IRC R501.2Town of Simsbury · 2026$50,000
FULL REMODEL OF DISTRESSED PROPERTY, FULL KITCHEN REMODEL, POWDER ROOM, UPSTAIRS MASTER AND GUEST BATHROOM, LIGHTING, FLOORING, PAINT, ADDING STRUCTURAL TRIPLE LVL WITH POSTING TO BASEMENT PIERS. LOWER LEVEL POWDER ROOM INSTALLATION WITH LIBERTY TANK AND ALARM, NEW CABLE RAILING SYSTEM WITH GRASPABLE RAILS. UPDATE SMOKE ALARMS, INSTALL CONDUIT AND WIRE FOR A TESLA EV CHARGER IN GARAGE (NO ACCESS INTO GARAGE DIRECTLY FROM HOME, BUT IT IS ATTACHED TO THE BUILDING, WE ARE THE BAY FARTHEST FROM THE UNIT, GARAGES ARE A WOOD TRUSS SYSTEM WITH NO SHEETROCK ON CEILINGS, WE INTEND TO GET NEIGHBOR APPROVAL TO WORK IN THE TRUSSES RUNNING THE CONDUIT ABOVE THEIR UNIT TO PULL WIRE TO OUR GARAGE BAY, EV CHARGER UNIT WILL HAVE A SMALL SUB PANEL WITH DISCONNECT. ADDITIOANLLY, WE INTEND TO SHEETROCK OUR GARAGE CEILING IF APPROVED BY THE ASSOCIATION FOR FIRE PROTECTION AND THEFT.Town of Simsbury · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Alteration/Renovation-ResidTown of Simsbury · 2026
Install new GFCI outlet and rework wiring and switching to accommodate one slimline LED light in front of the toilet, one slimline LED light over the shower that is GFCI protected, one slimline LED light at the entry door, and one sconce above the vanity. Existing bath fan is already vented and wiring will be adjusted as needed. All rough-in and final electrical work included. Supply and install new vanity shutoff valves and waste line outside the wall, with the wall opened and termination relocated if needed to accommodate the new vanity. Install new vanity faucet supplied by the homeowner. Supply and install new shower valve assembly including rough-in and finish trim. Supply and install new elongated toilet with seat. All tub drain work and tub installation included. Supply and install new 60 by 32 bathtub. Replace bathroom baseboard cover. Install insulation on the exterior wall to reduce air intrusion and maintain a proper thermal break, and repair or replace ceiling insulation removed for electrical work. Supply and install moisture-resistant drywall on all walls and ceilings, apply three coats of joint compound, and sand smooth to achieve primer-ready surfaces. Apply PVA primer to all newly installed drywall and sand smooth after drying. Apply kitchen and spa-grade ceiling paint for moisture resistance and two coats of semi-gloss trim paint to all trim and the bathroom door. Provide labor and all accessory materials to tile shower walls from the tub deck to the ceiling, including thinset, grout, cement board, and Kerdi band waterproofing. Supply and install new baseboard. Replace the bathroom door to match the master bedroom door previously installed by ECBG, including a new door, jamb, and matching MDF casing. Supply and install a new ProVia Aspect vinyl window with new 2-1/2 inch Colonial casing. ECBG will frame and box in the existing linen closet, leaving it ready for sheetrock.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1.Provide Smoke and CO Detectors per IRC for alterations and additions. IRC R314.2.2, R315.2.2
2.Separate Electrical, Plumbing, and Mechanical permits may need to be applied for. If work in these areas are being updated/repaired, or altered. IRC R105.1Town of Simsbury · 2026$28,151
RoofingTown of Simsbury · 2025
Scope of Work: Dumpster and permit, Tear off existing roof, Re-nail any loose wood decking, Install 6' Ice & Water Shield at gutter lines and valleys, Install seam tape and synthetic underlayment, Install GAF Starter Shingles on all edges, Install GAF Timberline HDZ Shingles (50-year) with 1-1/4 nails, Install GAF Hip & Ridge Shingles, Install GAF Ridge Vent, Install Ultimate Pipe Flashings, Install lead counter-flashing at chimneys, Full cleanup of debris and nails, Includes StainGuard Plus algae protection, Includes GAF Systems Plus 50-Year Warranty (transferable), Includes 15-Year Workmanship Warranty, Remove and Discard Electrical Cables, Install Grace Ice & Water Shield in the single floor dwelling area 32SQ.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Underlayment pictures are to be submitted to permit portal before final inspection.Town of Simsbury · 2025$18,338
remove existing roof shingles and replace with GAf asphalt shingles and replace existing guttersTown of Simsbury · 2025$21,537
remove existing roof shingles and replace with GAf asphalt shingles and replace existing guttersTown of Simsbury · 2025$21,537
REMOVE EXISITNG ROOF AND REPLACE WITH GAF ASPHALT SHINGLES-SEE ATTACHED DETAILED CONTRACTTown of Simsbury · 2025
REMOVE EXISITNG ROOF AND REPLACE WITH GAF ASPHALT SHINGLES-SEE ATTACHED DETAILED CONTRACT
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Underlayment pictures are to be submitted to permit portal before final inspection.Town of Simsbury · 2025$29,510
Remove existing siding and replace with Norandex vinyl siding-see attached detailed contract. BLANKETTown of Simsbury · 2025$37,235
Remove existing siding and replace with Norandex vinyl siding-see attached detailed contract. BLANKETTown of Simsbury · 2025$37,235