Install a 5 inch by 25 foot stainless steel smooth wall liner and connect to existing furnace.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Installation shall comply with the manufactures requirements and be sized accordingly. M1801.3.1Town of Simsbury · 2025$1,800
Take chimney down to the roofline, rebuild with new material, construct new crown, reflash and waterproof with Chimneysaver.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Photos shall be uploaded of the internal construction of the chimney.
2.Instalation shall comply with IRC section 1003Town of Simsbury · 2025$3,800
ChimneyTown of Simsbury · 2025
Install a 5 foot 25 foot stainless steel smoothwall liner and connect to existing furnace.Town of Simsbury · 2025$1,800
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Install a 5-inch 35-foot stainless steel smooth wall liner and connect to the furnace and hot water heater. Gas Furnace
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections.Town of Simsbury · 2025
$1,800
Boiler/FurnaceTown of Simsbury · 2025
Install a 5.5-inch 30-foot stainless steel smoothwall liner and connect to the furnace.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections.Town of Simsbury · 2025$1,800
Boiler/FurnaceTown of Simsbury · 2025
Boiler/FurnaceTown of Simsbury · 2025
Install a 5.5-inch 30-foot stainless steel Smoothwall liner and connect to the furnace.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Vent is to be of proper material for appliance it is connected to, Also installation is to follow all manufacture`s instructions. IRC M1803.3Town of Simsbury · 2025$2,000
Permitted projects on public record. Addresses are omitted for privacy.