Full renovation, see scope. Windows & doors. Kitchen and bathrooms. Siding.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1)Provide Smoke and CO Detectors per IRC for alterations, repairs and additions. IRC R314.2.2, R315.2.2
2)Separate Electrical, Plumbing, and Mechanical permits are to be applied for. IRC R105.1
3.. Vent bath fan to exterior not into building. IRC M1505.2
4.. When shower liners are water tight by materials from IRC P2709.2 and before tile is installed. A shower pan test will be required before membrane are concealed. This test is to follow all requirements of IRC P2503.6Town of Simsbury · 2025$152,276
Alteration/Renovation-ResidTown of Simsbury · 2025
Permitted projects on public record. Addresses are omitted for privacy.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.