Before you call anyone, write down what you want done. In New York the same room can be three very different jobs, and each one brings a different price, a different set of approvals and a different kind of contractor.
Three sizes of job
Size 1 · No permit
A refresh
Painting, plastering, new cabinets, refinishing floors, swapping a sink or toilet for a new one in the same place. The Department of Buildings does not require a permit for this kind of work.
Size 2 · Permit
A renovation
Adding a bathroom, moving plumbing or gas lines, new wiring, taking down or moving walls. This needs a permit, and in most cases plans filed by a licensed architect or engineer.
Size 3 · New certificate
A change to the building
Work that changes how a space is used, the exits, or the number of stories. The city files this as an "Alteration-CO" because it ends with a new Certificate of Occupancy. It is the slowest and most expensive kind.
Why the size matters for price
Permits show it plainly. A filing that mentions bathroom work and nothing else typically declares $18,850. When the bathroom is part of a larger renovation the typical filing is $61,775. For kitchens the same two figures are $30,000 and $67,000. Deciding whether you are doing one room or several is the biggest single choice you will make about cost.
Three things about your building
- House, co-op or condo? In a co-op or condo the building has to approve the work before the city does. See step 4.
- Is it a landmark, or in a historic district? Then the Landmarks Preservation Commission is involved too.
- How old is it? Older buildings bring lead paint and asbestos rules. See step 8.
Do this now
Write one paragraph that says which rooms, what is moving, and what is only being replaced. Every contractor should price that same paragraph, or you cannot compare their quotes.
Questions people ask
What counts as a gut renovation in NYC?
There is no official definition. In practice it means taking a room or apartment back to the structure and rebuilding it, which moves plumbing, wiring and often walls, so it needs a Department of Buildings permit and plans filed by a licensed architect or engineer.
Can I renovate my NYC apartment without a permit?
Yes, if the work is cosmetic. The Department of Buildings does not require a permit for painting, plastering, new cabinets, refinishing floors or replacing a plumbing fixture. Moving plumbing or gas, new wiring and changing walls do need one.
Does a co-op or condo change what I can do?
Yes. The building must approve the work under its alteration agreement before the city permit, and many buildings restrict putting a kitchen or bathroom over a neighbor's living space.