Rebuild damaged deck same location and dimensions
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. All work is subjected to field inspections. Comments below are to be reviewed and followed.
1. Outside carrying beam is to only cantilever off outside piers 12 inches
2. Floor joists are to be 2x10 16'' O.C. that cantilever off carrying beam 18 inches
3. Hot tub is not mounted on deck itself.
4. Hot tub is required to have it own permits IRC R105.1
5. Footing, framing, and final inspection are required. IRC R109.1Town of Simsbury · 2025$24,000
DecksTown of Simsbury · 2025
RoofingTown of Simsbury · 2025
Remove old shingles from roof replace with GAF Timberline HDZ charcoal, Synthetic, Ice&water shield, seam tape ,Town of Simsbury · 2025$16,860
RoofingTown of Simsbury · 2025
Remove old shingles from roof install new GAF Timberline HDZ pewter Grey I&W Shield synthetic drip edge 4 seam tape 15 sqTown of Simsbury · 2025$22,467
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.