Oil to Lp boiler Swap , gas piping and repair broken radiatorsTown of Bristol · 2026$7,500
Oil to Lp boiler Swap , gas piping and repair broken radiatorsTown of Bristol · 2026$7,500
Scope of Work: Interior restoration including a kitchen and bathroom remodel and window replacement. Work Area-both units of the two-family dwelling. Electrical Permit and Plumbing Permit Separate.Town of Bristol · 2026$25,000
Scope of Work: Interior restoration including a kitchen and bathroom remodel and window replacement. Work Area-both units of the two-family dwelling. Electrical Permit and Plumbing Permit Separate.Town of Bristol · 2026$25,000
Remove existing shingles down to the sheathing. Install new GAF architectural shingles and roofing system. Seam tape and ice and water 6 feet up. 15 squareTown of Bristol · 2025$5,000
Remove existing shingles down to the sheathing. Install new GAF architectural shingles and roofing system. Seam tape and ice and water 6 feet up. 15 squareTown of Bristol · 2025$5,000
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
We will remove existing gutters and downspouts. We will supply and install new gutters and downspouts, including leaf protection.We will supply and frame a new staircase for decks, including PT decking and railings. We will supply and repair the railing on the lower deck where loose. We will supply and replace up to 120 linear feet of pressure-treated decking boards.Town of Bristol · 2025
$9,000
We will remove existing gutters and downspouts. We will supply and install new gutters and downspouts, including leaf protection.We will supply and frame a new staircase for decks, including PT decking and railings. We will supply and repair the railing on the lower deck where loose. We will supply and replace up to 120 linear feet of pressure-treated decking boards.Town of Bristol · 2025$9,000
ROOFING (R)Town of Bethlehem · 2025$12,000
Replace Oil tank. Replace with same tank, New.Town of Bristol · 2025$3,500
The previous owner had stripped and removed pipes. Replace pipes removed with new in order to get water back up and running to property.Town of Bristol · 2025$1,500
Replace Oil tank. Replace with same tank, New.Town of Bristol · 2025$3,500
Permitted projects on public record. Addresses are omitted for privacy.