Andover CT, Barkhamsted CT, Beacon Falls CT, Berlin CT, Bethel CT, Brookfield CT, Canaan CT, City of Middletown CT, City of Stamford, City of Torrington, Colchester CT, East Granby CT, East Hampton CT, East Lyme CT, Groton CT, Lebanon CT, Manchester CT, Monroe CT, Montville CT, New Britain CT, Newington CT, Salem CT, Shelton CT, Somers CT, Southbury CT, Southington CT, Stonington CT, Stratford CT, Town of Bethany, Town of Bethlehem
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Installation of 13 roof mounted solar paneld, 5.59kW, in addition to an existing PV system. No structural upgrades.Town of Glastonbury · 2026
$16,099
Solar Panel - Roof mountTown of Simsbury · 2026
Installation of 26 roof mounted solar panels, remove roof fan.
Your application for a Building Permit has been reviewed for compliance with the 2022 State of Connecticut Building Code. The permit for the proposed work is approved. Please review our comments listed below. Conditions are subjected to field inspections.
1. Provide C/O detection per IRC 315.2.2
2.1. NO STRUCTURAL UPGRADE IS REQUIRED- on the existing structure for installation of the array(s) as proposed, per provided engineer’s evaluation.
3. Roof access and pathways are to be provided per ’21 IRC section R324.6 of the ’22 CT State Building Code.
4. PV Array occupancy not more than 33% of plan view total roof area, shall have a clear setback of not less than 18 inches on both sides of horizontal ridge. IRC R324.6.2Town of Simsbury · 2026$36,335
Installation of 31 Roof mounted solar panels, 13.33kW. No structural upgrades.Town of Bristol · 2026$49,854
Installation of 31 Roof mounted solar panels, 13.33kW. No structural upgrades.Town of Bristol · 2026$49,854
Permitted projects on public record. Addresses are omitted for privacy.