Demolition:
HSG case #25-020612; Demolition of 1978 sq ft SFR with a 525 sq ft garage. All utilities to be terminated within 5 Ft. of property-line, all slab, concrete, brick and footings shall be removed, the top one foot of fill shall be clean earth and graded level with adjoining property grade(s). The permittee shall provide such excavation with a Semi-permanent, six-foot-high fence, capable of resisting lateral force of fifteen (15) pounds per square foot, to protect the excavation on all sides from pedestrian access. All debris, building material and rubbish must be removed from the property not later than ten (10) days after the building structure(s) have been razed/demolished. SCC Chapter 15.44
New development to be ran through CDD.City of Sacramento · 2025$10,000
Permitted projects on public record. Addresses are omitted for privacy.
Are you RUE'S COMMERCIAL APPLIANCE INSTALL & REPAIR?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.