1) API will contact 811 " call before you dig" to identify any utility that may be in the way of excavation. This may take up to three working days to complete.
2) API will apply for a city or county permit for work proposed prior to starting work.
3) Once permit is pulled API will set up traffic cones in front of the work area and coordinate with the customer about drive way not being accessible while work is being performed.
4) API will then cutting a 3'x4' section of the drive way over the existing clean out located at the end of the driveway left side and remove.
5) API will then excavate down approximately 5' in depth by hand and set up trench safety equipment for trench entry.
6) API will then cut a section of failed sewer line and replace using proper fittings and stainless steel braded bands for connections approved by city or county code.
) API will then back fill the trench using 3/4 base rock to bed the pipe and native soil up to ground level.Sacramento County · 2025$10,649
replace 10’ of defective cast iron sewer pipe
1. Jackhammer, remove, and haul away 2 slabs of concrete from the clean out location in the breezeway towards the street. 2. Dig and expose the cast iron sewer pipe from the clean out to 10’. 3. Cut out and remove the defective cast iron pipe up to 10’. 4. Install new ABS pipe up to 10’. 5. Run a camera to inspect the sewer line for proper install and test for leaks by running water. 6. Backfill around pipe with gravel and finish backfill using existing soil. 7. Replace concrete.Sacramento County · 2025$8,768
WATER HEATER CHANGE OUT.
40-gallon nat gas water heater
1. Drain, remove and haul away the existing water heater.
2. Install a new Rheem 40 gallon gas water heater.
3. Make code upgrades as needed.
4. Make water and gas connections with new supply lines.
5. Connect to the existing T&P drain and venting.Sacramento County · 2025$3,000
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
40 gallon water heater replacement
Sacramento County · 2025
$3,000
25' Sewer Main Line Replacement via Trenchless method with Pipe BurstingSacramento County · 2025$7,400
-remove as needed the portions of existing DWV domestic water piping to accommodate relocating
existing fixture.
- waste and water lines will be routed from existing location to new locations.
- install DWV and domestic water piping to accommodate fixtures and trim in their new location for
(1) shower stall.
-install a standard 57.5”L x 30W” shower stall.
-Waste and water lines will be routed from existing location to new locations as needed.Sacramento County · 2025$5,800
Armstrong proposes to crawl under the home, cut out existing waste plumbing from bathrooms and
kitchens and remove and dispose of old piping. Will pull toilets to access flanges and cut open
walls under kitchen and bathroom cabinets as necessary to access dirty arms and vents for proper
rebuild and reattachment to venting. Will rebuild plumbing system properly per code with Abs plastic
pipe and fittingSacramento County · 2025$18,800
Electric Water Heater Install: Unit #7
Armstrong Plumbing (API} will provide labor and materials to replace the existing 30gal EWH. We
will drain, remove and haul away the existing EWH. We will then install the new 30 EWH with new 3/4" stainless steel flex lines, shut off
valve, properly run T&P line, expansion
tank and electrical disconnect box.Sacramento County · 2025$2,800
1. Remove boulder, then excavate a 3’ x 5’ area of dirt in order to expose the 4” main sewer line.
2. Install shoring equipment in the excavated area.
3. Cut out a 5’ section of cast iron pipe, then rebuild in 4” ABS pipe including a property line clean out.
4. Inspect for leaks and proper flow then bed the pipe with crushed rock and sand.
5. Backfill soil, then set a garden sewer box for the property line access.
6. Camera inspect the installation.Sacramento County · 2025$8,856
1. Cut out both gas tees under the house for the water heater, furnace, and stove.
2. Install new gas pipe and fittings as needed to connect the main gas trunk line to the 3 gas fixtures existing pipes.
3. Put gas line on test for inspections.Sacramento County · 2025$3,000
Water heater changeout only. No additional electrical, mechanical, plumbing, or structural work permitted.; Water heater to be replaced with Ruud professional grade 40 gallon water heater.
Expansion tank to be replaced with newSacramento County · 2025$2,753
-Locate sewer line.
-Excavate up to 4 feet down to access sewer main.
-Remove section of sewer pipe.
-Install cast iron two way cleanout with riser.
-Test for proper performance.
-Hydrojet mainline and run camera.
-Backfill after inspection.Sacramento County · 2025$2,697