Commercial reroof project. Remove and dispose of the existing roofing system down to the structural concrete deck and install a new fully adhered PVC roofing system including vapor barrier insulation cover board flashing replacement waterproofing of penetrations and replacement of existing scuppers. No roof sheathing replacement is included in the scope of work.City of Seattle · 2026
Roof REPLACEMENT + WARM ROOF CONVERSION Solution:- Installation of Vapor Barrier on the entire roof deck. Installation of Vapor Barrier on the entire roof deck. -Installation of 6.6" Polyisocyanurate (PolyISO) insulation across the entire roof area-Installation of two layers of Fire Retardant (FR-10)-Installation of DURO-LAST 60mil PVC (GREY) Roofing System over the entire roof area (MECHANICALLY ATTACHED).City of Seattle · 2026
Roof Deck Overlay with 60mil PVC.City of Seattle · 2025
Replacing existing SBS/APP Torch-down roofing system with TPO 80mil Single-ply Roofing System.City of Seattle · 2025
Roof replacement with 60mil PVC UNITS SECTION: 3 410 sq.ft.City of Seattle · 2025
Re-roof with Duro-Last 60mil PVC Roofing System (Mechanically Attached)Replacing 24 sheets of plywoodCity of Seattle · 2025
Roof Replacement with GAF Modified Bitumen (granule coated) Three-Ply Roofing SystemCity of Seattle · 2025
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Overlay over a single layer of SBS/APP Torch-down roofing system with 1/2" fanfold insulation and 60mil PVC Single-ply roofing membrane. No removal of the existing roofing system. No plywood removal or replacement. No structural modification or alterations.City of Seattle · 2025
Removal of existing SBS/APP Torch-down roofing System to the roof deck installing two layers of FR-10 Fire Retardant and 60mil PVC Single-ply Roofing Membrane. Installing new metal coping. No plywood replacement. No structural modifications.City of Seattle · 2025
Remove existing roofing membrane. Replace aprox.. 600sq ft of plywood. Install mechanically attached 60mil pvc roofing membrane.City of Seattle · 2025
Complete roof replacement with 60 mil PVC with plywood replacementCity of Seattle · 2024
Removing existing SBS roofing system and replacing existing plywood sheathing with cdx 1/2" plywood sheathing covering from COLD to WARM roof by installing R-38 PolyISO insulation on top of plywood sheathing in waterproofing with PVC 60mil single-ply roofing membrane.City of Seattle · 2023
Permitted projects on public record. Addresses are omitted for privacy.