A Multifamily Residential Alteration to Existing Structure Fire Alarm TransmitterBellevue · 2026
A Multifamily Residential Alteration to Existing Structure Fire Alarm TransmitterBellevue · 2026
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (9 Fire Alarms)Bellevue · 2025
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (3 Fire Alarms)Bellevue · 2025
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (3 Fire Alarms)Bellevue · 2025
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (1 Fire Alarms)Bellevue · 2025
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (4 Fire Alarms)Bellevue · 2025
Upgrade the existing fire alarm system. A new addressable fire alarm control panel will be installed. Existing radio communication will be used to maintain supervision of the new system. Remote annunciator will be installed at the 1st floor main entrance. All notification will be replaced with new.Bellevue · 2025
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Upgrade the existing fire alarm system. A new addressable fire alarm control panel will be installed. Existing radio communication will be used to maintain supervision of the new system. Remote annunciator will be installed at the 1st floor main entrance. All notification will be replaced with new.Bellevue · 2025
Modifying the existing fire alarm system. A new remote power supply will be installed in the fire control room located in the basement. The existing trigger-sync circuit will be connected to the new RPS for supervision and activation. New notification devices will be installed throughout Suite 202 providing proper coverage.Bellevue · 2025
Modifying the existing fire alarm system. A new remote power supply will be installed in the fire control room located in the basement. The existing trigger-sync circuit will be connected to the new RPS for supervision and activation. New notification devices will be installed throughout Suite 202 providing proper coverage.Bellevue · 2025
Installing 6 monitoring points on newly installed spirnkler riser (2 wet, 1 dry), PIV, OS&Y and Backflow. Installing 1 exterior horn strobe outside of riser room.Bellevue · 2025
Permitted projects on public record. Addresses are omitted for privacy.