What the public permit record shows, not self-reported reviews.
Is MASS ELECTRIC CONSTRUCTION CO a real contractor?
MASS ELECTRIC CONSTRUCTION CO appears in public building-permit records with 84 permits filed through 2026 in and around Bellevue, WA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is MASS ELECTRIC CONSTRUCTION CO's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to MASS ELECTRIC CONSTRUCTION CO by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is MASS ELECTRIC CONSTRUCTION CO licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. MASS ELECTRIC CONSTRUCTION CO has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is MASS ELECTRIC CONSTRUCTION CO's work?
The most recent permit on record for MASS ELECTRIC CONSTRUCTION CO is dated 2026-04-23, with 84 permits on file in total.
Setup traffic control at the intersection of NE 6th St. and 112th Ave. NE for the installation of mile post markers on existing OCS poles on the E750 rail alignment.Bellevue · 2024
Installation of Traffic Signals, Traffic Loops and Pedestrian Gates at 130th Ave NE and 132nd Ave NEBellevue · 2024
Install new BDA and DASBellevue · 2023
Install new BDA and DASBellevue · 2023
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (2 Intercom and Communication, 2 Cable TV or Closed Circuit TV Coaxial Cable, 2 Telecommunications System)Bellevue · 2023
MEC will be installing the DAS system in the S. Bellevue Parking Garage and S. Bellevue Station.Bellevue · 2023
Installation of feeders, two new disconnect switches, and a transformer to provide power to a new Signal House under the E750 contract for Sound Transit.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you MASS ELECTRIC CONSTRUCTION CO?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to MASS ELECTRIC CONSTRUCTION CO's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Bellevue · 2022
Installation of feeders, two new disconnect switches, and a transformer to provide power to a new Signal House under the E750 contract for Sound Transit.Bellevue · 2022
Install new DAS at station, Bellevue Tunnel and shaft, South Portal Electrical Building, E750Bellevue · 2022
**EXT to Jun 30 due to further delays from city project. tjs 05/02/23 **EXT to May 25. Waiting for signal cab at 130th. tjs 03/16/23 **EXTENDED to Feb 28 for needed OCS adjustments and re-testing. tjs 01/23/23** **EXTENDED to Jan 31, as an additional week of testing is needed. tjs 12/14/22** Initial live wire testing with the LRV. 4 car Train will move along the newly constructed railway under power for speed testing, on both tracks and in both directions. Each intersection will have UPO''s controlling vehicular traffic on both sides of the crossing, flaggers will control pedestrian traffic on both sides of the crossing, VMS signs placed 72 Hours prior to testing alerting public of upcoming live train testing. Location: East Link Guideway at 130th, 132nd, and 136th/Spring, and 136th/NE 20th (East Link E750)Bellevue · 2022
Permitted projects on public record. Addresses are omitted for privacy.