Removal and replacement of storm drain per direction from COB inspector Richmond Ford., RTA/CN 0012-13Bellevue · 2022
Lane closures per approved TCP for a maximum of two (2) days in each direction only (CCTV storm lines).Bellevue · 2022
Installing Bird Control Devices (BCD) on our aerial guideway caps (property of Sound Transit). One lane will be closed at a time on each side of the street so that traffic remains flowing at all times.Bellevue · 2022
Installing Bird Control Devices (BCDs) on west half of Aerial Guideway Caps that run over 140th Ave, parallel with EB 520.Bellevue · 2022
Road closure for pig sealing the span on both sides that cross over the road.Bellevue · 2021
Pouring/Setting/Commissioning the 140th Light PoleBellevue · 2021
Lane closures (one during the day, and two lanes with a shift at night). This permit is for TEMPORARY TRAFFIC CONTROL ONLY. The design of the light standard and foundation must be approved through a separate process prior to install.Bellevue · 2021
Closure on 148th to facilitate aerial guideway work.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Bellevue · 2020
Guide way pressure wash and pig sealBellevue · 2020
**EXTENDED to July 31 to complete light pole installation. tjs 05/21/20** This permit includes the installation of 1 fire hydrant, 1 luminaire, sidewalk repair and grind and overlay. NIGHT WORK.Bellevue · 2020
Scope of work includes installing utilities and pig seal.
Location - 2885 152nd Ave NEBellevue · 2019
**EXTENDED to Mar 20 to accommodate final closure for finish work (scheduled for Feb). tjs 12/20/19** Full NIGHT closure of 148th Ave NE for overhead work for aerial guideway (diaphragms, drainage, deck/barrier, dry finish).Bellevue · 2019
Permitted projects on public record. Addresses are omitted for privacy.