A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Added or Altered Branch Circuits)Bellevue · 2024
Install 240V/200A single phase service for DISH Wireless rooftop cell tower site. Install 4 x 240V/30A and 1 x 120V/20A branch circuits from new electrical panel to equipment cabinet.Bellevue · 2024
Install 480V/100A feeder with from existing switchboard in electrical room to rooftop cell site for DISH Wireless. Install 100A disconnect and 50kVA 480V to 240V/120V 200A step-down transformer on rooftop. Install 120V/240V/200A sub-panel on rooftop with 4 x 240V/30A and 1 x 120V/20A branch circuits from sub-panel to equipment cabinet.Bellevue · 2024
A Nonresidential Alteration to Existing Structure Project Installing {5-Light Fixtures, 6-Receptacles, 15-Added or Altered Branch Circuits, Feeder, Subpanel} Removal of existing light pole bases so the parking lot can be raised. Replacing after raised *Plan review waived by Steve LeightonBellevue · 2024
A Nonresidential Alteration to Existing Structure Electrical Project Involving (Sign Circuit)Bellevue · 2024
A Nonresidential Alteration to Existing Structure Electrical Project Involving (1 Receptacles, 8 Industrial Equipment)Bellevue · 2022
Small Cell for Verizon wireless Node 13 Archer-line. Plan review waived by Chuck or Steve.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Bellevue · 2022
A Nonresidential Alteration to Existing Structure Project Installing {2-Added or Altered Branch Circuits} 200 amp branch circuit from panel to rectifier and add additional work lights. ** Plan review waived by S. LeightonBellevue · 2022
Upgrade service conductorsBellevue · 2022
A Nonresidential Alteration to Existing Structure Electrical Project Involving (6 Added or Altered Branch Circuits)Bellevue · 2022
A Nonresidential Alteration to Existing Structure Project Installing {1-Added or Altered Branch Circuits, 1-Other Equipment} Wire 200 amp rectifier from Panel to new cabinet. **Plan review waived by Steve Leighton**Bellevue · 2021
Replace the existing 60amp 480V feeder with a new 100 amp 480V feeder. Replace existing transformer and panel. Wire new rectifier equipment from the panel., 21108316Bellevue · 2021
Permitted projects on public record. Addresses are omitted for privacy.