Upgrading the existing 200 amp panel to a new 200Amp panel, new circuits as needed for new T-mobile radio cabinet.Bellevue · 2021
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)Bellevue · 2021
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)Bellevue · 2021
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)Bellevue · 2021
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)Bellevue · 2021
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)Bellevue · 2021
A Nonresidential Alteration to Existing Structure Low Voltage Only Project Involving (1 Telecommunications System)Bellevue · 2021
100 Amp 480 V fed from existing 480 V 1200 Amp panel board to new T-Mobile 50 KVA transformer, Feed to new 50 KVA transformer, then from XFMR new 200 amp 120/240V panel, circuit from 200 Amp panel to new T-Mobile radio equipment. *Plan review waived by Chuck Murray
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Bellevue · 2020
400 Amp service from existing transformer to new Verizon Wireless Radio equipment room. Generator for shelter,Bellevue · 2020
100 Amp 480V service next to existing service, 100 A feed from service to 50 KVA transformer on the roof, feed from xfmr to panel, circuits as needed from panel to Verizon radio equipment.Bellevue · 2020
100 Amp 480V service next to existing service, 100 A feed from service to 50 KVA transformer on the roof, feed from xfmr to panel, circuits as needed from panel to Verizon radio equipment.Bellevue · 2020
Upgrading the existing service from 100 Amp 480v to a new 200 Amp 480, upgrading the existing panel and HVAC equipment.Bellevue · 2019
Permitted projects on public record. Addresses are omitted for privacy.