84th EB off ramp lane/ramp will be closed to repave shoulder and adjust one junction box lid elevation. Ramp closure will detour traffic to Bellevue Way NE off ramp and NE 24th St. Reference MOT plan for visual reference. WSDOT to contact Rick Logwood (rlogwood@bellevuewa.gov) 4 days in advance of closure with permit number, closure dates and hours.Bellevue · 2018
ECC is preparing to perform a repair on the Bellevue Way to WB SR 520 ramp during the full closure of SR 520 on the weekend of August 26th-28th. The repair will consist of full depth milling of a 20' x 36' section of pavement, compacting the subgrade, and re-paving with full depth HMA.Due to the proximity of the work on the ramp, we will also need to take one lane of Southbound Bellevue Way from the Northrup intersection to just South of the ramp (see attached TCP) to allow for a proper work zone.The work will require a 6-8 hour work window and we would like to accomplish this during the daytime from the hours of 8 am to 4 pm on Saturday August 26th.Bellevue · 2017
Water service. Ref. 12-124891 UC.Bellevue · 2015
Water service.Bellevue · 2015
Scope consists of non-structural partitions and b/s doors. Area of work is 650 sf.Bellevue · 2014$7,000
Clearing and grading. Pin and pile noise wall connected to a soldier pile wall, encasing utilities.Bellevue · 2013$190,700
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.