What the public permit record shows, not self-reported reviews.
Is BOONE ELECTRIC CONSTRUCTION a real contractor?
BOONE ELECTRIC CONSTRUCTION appears in public building-permit records with 60 permits filed through 2026 in and around Bellevue, WA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is BOONE ELECTRIC CONSTRUCTION's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to BOONE ELECTRIC CONSTRUCTION by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is BOONE ELECTRIC CONSTRUCTION licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. BOONE ELECTRIC CONSTRUCTION has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is BOONE ELECTRIC CONSTRUCTION's work?
The most recent permit on record for BOONE ELECTRIC CONSTRUCTION is dated 2026-03-10, with 60 permits on file in total.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you BOONE ELECTRIC CONSTRUCTION?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to BOONE ELECTRIC CONSTRUCTION's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Bellevue · 2025
A Nonresidential Alteration to Existing Structure **Plan review waived by Chuck Murray** disconnect ev charger to demo slab, replace concrete slab, reinstall the same charger.Bellevue · 2025
A Nonresidential Alteration to Existing Structure Electrical Project Involving (2 Receptacles, 2 Added or Altered Branch Circuits)Bellevue · 2024
A Single Family Condo Unit Alteration to Existing Structure Electrical Project Involving (1 Service Change 201-399 amps)Bellevue · 2024
Permitted projects on public record. Addresses are omitted for privacy.