Post Revision 11: Dismantle the crane tower
Post Revision 9: Trench restoration for the for the sewer connections on 116th Ave SE .
Post Revision 8: Delivery and staging of mobile crane on NE 4th St to set modular wetland vault clouded in blue on sheet U2.2
Post Revision 7: Updated TC plans for the sanitary sewer utility connections on 116th Ave.
Post Revision 5&6: Sanitary sewer utility connections on 116th Ave. and the demolition of the existing barrier wall along NE 4th St for the future driveway connections.
Post Revision 3: Storm Drain Connection on 116th Ave. NE “Subject to Utility Extensions Permit # 17 120519 UE”
Haul Route only for the demolish existing building and the site improvements. Subject to Clearing & Grading permit # 17 120511 GD.Bellevue · 2018
Construct alterations to existing office tenant space areas on the 2nd floor of existing commercial building per plan.City of Seattle · 2017
Construct alterations to second level of existing mall building to change use of portion of second level from retail to restaurant (food court) per plan (mechanical included).City of Seattle · 2017
Tenant Improvement of an existing Restaurant spaceBellevue · 2016$75,000
New entry addition to include storefront and canopy/roof., 16-132402-BZBellevue · 2016$350,000
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
22,500sf T.I. with new partitions, doors, ceiling/floor finishes. Restroom refresh and new exterior openings.Bellevue · 2016$2,800,000
The project consists of about 22,017 sf full TI retail space build out at grade level., 15103611BBBellevue · 2016$517,796
Due to a remodel the existing grease interceptor will be abandon and a new 2,000 gallon grease interceptor will be installed.Bellevue · 2016
Finish upgrade, selective demolition, restroom finish upgrade, new lighting controls, new AV controls and equipment, new lighting, re lamping, new electrical outlets and circuits, HVAC modification but no additional load, minor structural work primarily blocking to support hanging of AV equipment and new wall paneling.Bellevue · 2015$2,330,000
Exterior repairs and partial recladding of façade portions. Work is non-structural. Exterior Color and material changes are proposedBellevue · 2015$1,487,000
otherCity of Seattle · 2015$32,250,000
Permitted projects on public record. Addresses are omitted for privacy.