What the public permit record shows, not self-reported reviews.
Is ADVANCED ELECTRICAL TECHNLGIES a real contractor?
ADVANCED ELECTRICAL TECHNLGIES appears in public building-permit records with 10 permits filed through 2025 in and around Bellevue, WA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ADVANCED ELECTRICAL TECHNLGIES's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ADVANCED ELECTRICAL TECHNLGIES by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ADVANCED ELECTRICAL TECHNLGIES licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ADVANCED ELECTRICAL TECHNLGIES has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ADVANCED ELECTRICAL TECHNLGIES's work?
The most recent permit on record for ADVANCED ELECTRICAL TECHNLGIES is dated 2025-08-12, with 10 permits on file in total.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ADVANCED ELECTRICAL TECHNLGIES?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ADVANCED ELECTRICAL TECHNLGIES's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Connect a temporary soil remediation system (trailer mounted equipment) with power from the electrical room in the basement. The remediation system will operate for 3 to 6 months before the site construction projects will begin., Equipment will be placed in the parking lot and the power will be provided from the electrical room in the basement., Provide a power connection to a soil remediation system.Bellevue · 2012
Permitted projects on public record. Addresses are omitted for privacy.