What the public permit record shows, not self-reported reviews.
Is 16D LLC a real contractor?
16D LLC appears in public building-permit records with 119 permits filed through 2026 in and around Bellevue, WA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is 16D LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to 16D LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is 16D LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. 16D LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is 16D LLC's work?
The most recent permit on record for 16D LLC is dated 2026-06-08, with 119 permits on file in total.
A Multifamily Residential Alteration to Existing Structure Electrical Project Involving (1 Pump, 1 Added or Altered Branch Circuits)Bellevue · 2026
COMMERCIALCity of Shoreline · 2026
Replace elevator disconnect using existing feeders and upstream OCP. Relocate elevator utilization circuits to machine room panel. Upgrade mach room and pit lighting to LED.Bellevue · 2025
For the purpose of elevator modernization: Install a dedicated function elevator control and supervision panel and landing and MR detection. No fire alarm or sprinklers existing.Bellevue · 2025
For the purpose of elevator modernization: Install a dedicated function elevator control and supervision panel and landing and MR detection. No fire alarm or sprinklers existing.Bellevue · 2025
REPLACE 100A ELEVATOR DISCONNECTS WITH 60A UNITS, USING THE EXISTING FEEDERS AND MAIN OCP. RELOCATE UTILIZATION CIRCUITS TO NEW MACH ROOM SUB PANEL. UPGRADE MACH ROOM AND PIT LIGHTING TO LED.Bellevue · 2025
REPLACE 100A ELEVATOR DISCONNECTS WITH 60A UNITS, USING THE EXISTING FEEDERS AND MAIN OCP. RELOCATE UTILIZATION CIRCUITS TO NEW MACH ROOM SUB PANEL. UPGRADE MACH ROOM AND PIT LIGHTING TO LED.Bellevue · 2025
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you 16D LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
A Nonresidential Alteration to Existing Structure Fire Alarm Project Involving (1 Fire Alarms)Bellevue · 2025
A Multifamily Residential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 1-Feeder, 3-Light Fixtures, 2-Switches, 2-Receptacles, 6-Added or Altered Branch Circuits, 1-Subpanel} REPLACE ELEVATOR DISCONNECT USING EXISTING FEEDERS AND UPSTREAM OCP. RELOCATE ELEVATOR UTILIZATIN CIRCUITS OCP TO MACHINE ROM SUB PANEL. UPGRADE MACH ROOM AND PIT LIGHTING TO LED. **Plan review waived by Steve Leighton**Bellevue · 2025
A Multifamily Residential Repair or Replacement Project Installing {1-Elevator, 1-Heat Pump, 1-Feeder, 3-Light Fixtures, 2-Switches, 2-Receptacles, 6-Added or Altered Branch Circuits, 1-Subpanel} REPLACE ELEVATOR DISCONNECT USING EXISTING FEEDERS AND UPSTREAM OCP. RELOCATE ELEVATOR UTILIZATIN CIRCUITS OCP TO MACHINE ROM SUB PANEL. UPGRADE MACH ROOM AND PIT LIGHTING TO LED. **Plan review waived by Steve Leighton**Bellevue · 2025
Replace elevator disconnect using existing feeders and upstream OCP. Elevator NOT on emergency power.
- Relocate existing elevator utilization circuits (machine room lights, machine room outlets,cab lights, pit, etc) to new elevator machine room sub-panel.
- Upgrade machine room and pit lighting to LEDBellevue · 2025
Replace elevator disconnect using existing feeders and upstream OCP. Elevator NOT on emergency power.
- Relocate existing elevator utilization circuits (machine room lights, machine room outlets,cab lights, pit, etc) to new elevator machine room sub-panel.
- Upgrade machine room and pit lighting to LEDBellevue · 2025
Permitted projects on public record. Addresses are omitted for privacy.