200 amp heavy-up; NA; ElectricalArlington County · 2026$5,000
Mount one 12U" Wall Mount rack • Mount five 24-port Cat6 patch panels • Mount four 1U horizontal cable managers • Install a total of 109 Cat6 Plenum data cables per floor plan - 36 Triple Cat6 cable drops - 1 Cat6 cable drop for an AP; NA; ElectricalArlington County · 2025$21,044
KOHLER 20 KW STANDBY GENERATOR, 200RXT SERVICE RATED TRANSFER SWITCH.; NA; ElectricalArlington County · 2024$14,000
32 LOW VOLTAGE DATA DROPS; NA; ElectricalArlington County · 2023$8,400
INSTALLATION OF ONE KOHLER 400 AMP RXT ATS AND ONE KOHLER 30RCLC STANDBY GENERATOR; NA; ElectricalArlington County · 2023$39,000
200 AMP HEAVY-UP; NA; ElectricalArlington County · 2026$5,000
Mount one 12U" Wall Mount rack • Mount five 24-port Cat6 patch panels • Mount four 1U horizontal cable managers • Install a total of 109 Cat6 Plenum data cables per floor plan - 36 Tripple Cat6 cable drops - 1 Cat6 cable drop for an AP; NA; Electrical
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Arlington County · 2025
$21,044
• Install a total of 26 Cat6 Plenum data cables per floor plan • Install one 18-2 speaker wire daisy chained for 5 speakers • Install one 22/4 cable for 360 motion • Install five speakers and two APs; NA; ElectricalArlington County · 2025$12,650
Kohler 20RCA generator and 200RXT transfer switch; NA; ElectricalArlington County · 2022$13,000
Permitted projects on public record. Addresses are omitted for privacy.