The proposed work includes a stormwater diversion plan designed to meet both water quality and quantity compliance requirements. Stormwater management features—such as a planter box and permeable pavement—will be implemented to support these objectives. The drainage plan modifies the area directed to the stormwater management (SWM) facilities while preserving the existing flow pattern toward an established storm structure on 7th Street North. No offsite grading is proposed, and construction activity will remain within the designated clearing and grading boundaries, aside from spreading topsoil and seeding. The proposed infrastructure connects to the home’s sanitary system, forming a closed-loop system to minimize environmental impact. Pre- and post-development runoff volumes remain essentially unchanged for a 10-year storm event (1.84 vs. 1.85 CFS). The total area of disturbance is 0.1382 acres. All proposed activities will comply with applicable right-of-way and excavation permit requirements.; NA; Excavation ROWArlington County · 2025
1:1 replacement of existing deck and stairs for property located at 4015 41st St. N Arlington, VA 22207.; Addition; Residential AdditionArlington County · 2026$38,000
Renewal Scope of work we are demolishing part of side walk, driveway apron, and connecting a Level Type II permeable driveway to the storm water system as per plans.; NA; Excavation ROWArlington County · 2025
Construct pool 19' x 9'-6"; Addition; Residential AdditionArlington County · 2025$150,000
replace existing retaining wall; Addition; Residential AdditionArlington County · 2024
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.