What the public permit record shows, not self-reported reviews.
Is TURNER CONSTRUCTION COMPANY a real contractor?
TURNER CONSTRUCTION COMPANY appears in public building-permit records with 38 permits filed through 2024 in and around Arlington County, VA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is TURNER CONSTRUCTION COMPANY's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to TURNER CONSTRUCTION COMPANY by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is TURNER CONSTRUCTION COMPANY licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. TURNER CONSTRUCTION COMPANY has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is TURNER CONSTRUCTION COMPANY's work?
The most recent permit on record for TURNER CONSTRUCTION COMPANY is dated 2024-08-06, with 38 permits on file in total.
Mill street, repair and re-pave ***PERMIT VALID TO OCCUPY THE ROW AT 2633 SHIRLINGTON RD FROM 08/12/24 THRU 08/19/24 MON-FRI 9 AM-4 PM DAILY*** ***MUST PROVIDE AND HAVE ONSITE AN APPROVED NOISE EXEMPTION TO WORK OUTSIDE OF THE STANDARD WORK HOURS*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT*** ***NO PERSONAL VEHICLES WILL BE PERMITTED IN THE WORK AREA UNDER THIS PERMIT AND IS SUBJECT TO TICKET AND TOWING*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***CONTACT DSB WITHIN 72 BUSINESS HOURS OF COMMENCING OPERATIONS FOR NO PARKING SIGNS*** ***IF NEW DATES ARE NECESSARY, DON'T HESITATE TO GET IN TOUCH WITH DSB CUSTOMER SERVICE BEFORE PAYING THE INVOICE***; NA; Transportation ROW - with excavationArlington County · 2024
Interior alterations on the 14th floor for Northeastern University office space.; CTBO; CTBOArlington County · 2024$5,400,000
Construct New Bus Canopy for the new ART Bus Facility.; New; Commercial NewArlington County · 2023$1,528,000
CONSTRUCTION OF A BUILDING ADDITION WITH A FOOTPRINT OF 16400SF, A PROPOSED DRIVEWAY CONNECTING VACATION LN TO OLD DOMINION DR FOR STUDENT DROP OFF, A NEW PARKING LOT, UPGRADES TO THE EXISTING ATHLETIC FIELD, UTILITY & UPGRADES, STORMWATER MANAGEMENT FACILITIES INCLUDING BIO-RETENTION, GREEN ROOF, & UNDERGROUND DETENTION; NoneArlington County · 2022
Community Upgrades to sidewalk and undergrounding of utilities per use premit; NA; Excavation ROWArlington County · 2020
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Show off your permit record — free
Add this Permit-Verified badge to TURNER CONSTRUCTION COMPANY's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Utility work along vacation Lane previously approved on 7/09/19 PW190940.; NAArlington County · 2019
ALTERATIONS TO THE 3RD FLOOR FOR SPEC SUITES AND A CONFERENCE CENTER. NEW EXTERIOR DOOR TO OUTSIDE 3RD FLOOR TERRACE. SPECIAL INSPECTIONS REQUIRED; CTBOArlington County · 2018$1,100,000
DEMO CONCRETE APRON, SIDEWALK, ASPHALT, AC UNIT PADS, INSTALL ADA RAMP, BIO RETENTION POD, PARKS, NEW ENTRY, SIDEWALKS. REMOVAL ONE TREE; NoneArlington County · 2017
INT ALT/EXT ALTERATIONS Special Inspections Required.; CTBOArlington County · 2016$300,000
INSTALL SYSTEM FURNITURE; CTBOArlington County · 2016$2,500
INT ALT 2nd FLOOR; CTBOArlington County · 2016$40,000
TENANT IMPROVEMENT TO BREAKROOM; CTBOArlington County · 2015$85,000
Permitted projects on public record. Addresses are omitted for privacy.