Exterior masonry repairs which includes shelf angle installation, flashing, CMU repairs, brick replacement, tuck pointing, installation of control joints and joint sealant replacement.; Addition; Commercial AdditionArlington County · 2024$220,050
Remove Pedestrian Overhead Protection from Sidewalk. Overhead protection was previously installed under permit TROW22-00276 ***PERMIT VALID TO OCCUPY THE ROW ON CRYSTAL DR FROM 06/27/23 THRU 07/03/23 MON-FRI 9 AM-4 PM*** ***MUST MAINTAIN THE PROPER TCP AND MOT WHILE OCCUPYING THE ROW, ALL NO PARKING REQUESTS MUST BE MADE 48 BUSINESS HOURS BEFORE BEGINNING OPERATIONS***; Work in ROW; Transportation ROW - no excavationArlington County · 2023
Contractor shall install overhead protection along Crystal Drive sidewalk to protect pedestrians during overhead work on the facade. The building permit already obtained for this project is #B2200111 ***PERMIT VALID TO OCCUPY THE SIDEWALK WHILE ASSEMBLING PED OVERHEAD PROTECTION FROM 07/18/22 THRU 07/29/22 MON-FRI 9 AM-4 PM*** ***PROPER SIGNAGE FOR PEDESTRIAN WARNING AND DETOURS MUST BE IN PLACE WHILE WORK IS BEING PERFORMED***; Work in ROW; Transportation ROW - no excavationArlington County · 2022
UNIT 1003 AND UNIT 1005 BALCONY PARAPET RECONSTRUCTION. REMOVE EXISTING BRICK PARAPET WALL TO CONCRETE SLAB, INSTALL LIQUID MEMBRANE FLASHING AT SHELF ANGLE, RECONSTRUCT BRICK PARAPET WALL VIA SWING STAGE.; CTBOArlington County · 2021$62,000
Will place pedestrian overhead protection on sidewalk at the southwest elevation, 75LF total, while fa�ade repairs on adjacent building are performed. See building permit #B2002157. *** FOR INSTALLATION OF OVERHEAD SCAFFOLDING ON SIDEWALK. WILL RE-APPLY FOR NEW PERMIT FOR REMOVAL. ***; Work in ROW; Transportation ROW - no excavation
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Arlington County · 2020
PRECAST FACADE PANEL REPAIRS - TIERS 2 & 9 SPECIAL INSPECTIONS REQUIRED; CTBOArlington County · 2020$164,200
PARTIAL SIDEWALK CLOSURE TO PERFORM WINDOW MAINTENANCE AT 1200 N HERNDON ST. **20 LFT OF WORK** WORK HOURS 9AM-4PM MONDAY-FRIDAY PROPER TRAFFIC CONTROL PLAN REQUIRED PERMIT MUST BE ON SITE TO BE VALID UNSAFE PRACTICES MAY RESULT IN PERMIT SUSPENSIONArlington County · 2019
VARYING PARTIAL SIDEWALK CLOSURES AT 2201 WILSON BLVD FOR FACADE & PAINTING WORK. N VEITCH ST / WILSON BLVD WILSON BLVD -- NO FULL CLOSURE OF SIDEWALK. PARTIAL CLOSURE AS NEEDED IS APPROVED N VEITCH ST -- AS NEEDED, SOME SHORT-TERM FULL CLOSURES OF SIDEWALK WITH PROPER PEDESTRIAN TEMPORARY TRAFFIC CONTROL PLAN ARE APPROVED 9AM-4PM WEEKDAYS THE PLAN PER THE APPLICANT IS TO MANAGE THIS CLOSURE AS A PARTIAL SIDEWALK CLOSURE WITH FULL PEDESTRIAN ACCESSIBILITY ON MOST DAYS. THE APPLICANT HAS OBTAINED A BUILDING PERMIT APPROVING OVERHEAD PROTECTION OF THE ENTRY-WAY ON WILSON BLVD.Arlington County · 2019
FACADE AND BALCONY REHABILITATION, REPAIR AND EXTERIOR DRYWALL SPECIAL INSPECTIONS REQUIRED; CADDArlington County · 2019$144,400
*** PAINTING AND CAULKING - EXTERIOR FACEDE, FLOORS 1 - 9. ***; CTBOArlington County · 2019$125,240
SIDEWALK CLOSURE WITH PROPER TRAFFIC CONTROL PLAN TO PROVIDE PEDESTRIAN OVERHEAD PROTECTION DURING CONSTRUCTION AT THE CORNER OF CLARENDON BLVD & N ODE ST FOR WORK AT 1550 CLARENDON BLVD APPROXIMATELY 65 LINEAR FT ON N ODE ST -- SEE SEPARATE PERMIT FOR NO ODE ST (PWT1900122)Arlington County · 2019
SIDEWALK CLOSURE WITH PROPER TRAFFIC CONTROL PLAN TO PROVIDE PEDESTRIAN OVERHEAD PROTECTION DURING CONSTRUCTION AT THE CORNER OF CLARENDON BLVD & N ODE ST FOR WORK AT 1550 CLARENDON BLVD APPROXIMATELY 85 LINEAR FT ON CLARENDON BLVD -- SEE SEPARATE PERMIT FOR NO ODE STArlington County · 2019