What the public permit record shows, not self-reported reviews.
Is STRITTMATTER CONTRACTING LLC a real contractor?
STRITTMATTER CONTRACTING LLC appears in public building-permit records with 11 permits filed through 2024 in and around Arlington County, VA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is STRITTMATTER CONTRACTING LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to STRITTMATTER CONTRACTING LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is STRITTMATTER CONTRACTING LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. STRITTMATTER CONTRACTING LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is STRITTMATTER CONTRACTING LLC's work?
The most recent permit on record for STRITTMATTER CONTRACTING LLC is dated 2024-07-08, with 11 permits on file in total.
Excavation of existing median. ****Contact Infrastructure Inspector for precon prior to starting work****; NA; Excavation ROWArlington County · 2024
This part of the Metropolitan Park 6, 7, and 8 project involves extensive construction for the streetscape work. The first step is demolishing the existing hardscape and excavating to install silva cells to support the new trees that will be installed. After the silva cells are installed irrigation lines and electrical conduit will be installed as the silva cells are backfilled. Once the silva cells are installed the hardscape will be installed. This is an extension of the EXCV22-01452 permit.; NA; Excavation ROWArlington County · 2023
This part of the Metropolitan Park 6, 7, and 8 project involves extensive construction for the streetscape work. The first step is demolishing the existing hardscape and excavating to install silva cells to support the new trees that will be installed. After the silva cells are installed irrigation lines and electrical conduit will be installed as the silva cells are backfilled. Once the silva cells are installed the hardscape will be installed.; NA; Excavation ROWArlington County · 2022
This part of the Metropolitan Park 6, 7, and 8 project involves extensive construction for the streetscape work. The first step is demolishing the existing hardscape and excavating to install silva cells to support the new trees that will be installed. After the silva cells are installed irrigation lines and electrical conduit will be installed as the silva cells are backfilled. Once the silva cells are installed the hardscape will be installed.; NA; Excavation ROWArlington County · 2022
Demolition of existing sidewalk, curb and gutter, and asphalt for utility work and installation of new improvements (utilities and improvements by others (Corinthian Contractors).); NA; Transportation ROW - with excavation
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you STRITTMATTER CONTRACTING LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to STRITTMATTER CONTRACTING LLC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Arlington County · 2020
Demolition of existing sidewalk, curb and gutter, and asphalt for utility work and installation of new improvements (utilities and improvements by others (Corinthian Contractors).); NA; Excavation ROWArlington County · 2020
Demolition of existing sidewalk, curb and gutter, and asphalt for utility work and installation of new improvements (utilities and improvements by others (Corinthian Contractors).); NA; Transportation ROW - with excavationArlington County · 2020
Demolition of existing sidewalk, curb and gutter, and asphalt for utility work and installation of new improvements (utilities and improvements by others (Corinthian Contractors).); NAArlington County · 2019
ARL PUBLIC SCHOOL PROJECT -- STRATFORD MIDDLE SCHOOL THIS WORK IS ON OLD DOMINION DR (VDOT ROAD) WITH LANE AND SIDEWALK CLOSURES WITH PROPER VDOT APPROVALS LANE & SIDEWALK CLOSURE WITH PROPER TRAFFIC CONTROL PLAN TO DEMOLISH PORTIONS OF EXISTING MEDIAN AND SIDEWALK FOR THE NEW ENTRANCE TO THE SCHOOL DRIVEWAY AND TRAFFIC SIGNAL BLANKET PUBLIC ROW PERMIT ISSUED TO TURNER (GC) COVERS PHYSICAL WORK TO BE PERFORMED BY VARIOUS SUBCONTRACTORS LANE AND SIDEWALK CLOSURES FOR MEDIANArlington County · 2019
Grading for new sidewalk, curb and gutter, and bioretention tree pits.; NA; Excavation ROWArlington County · 2023
This part of the Metropolitan Park 6, 7, and 8 project involves extensive construction for the streetscape work. The first step is demolishing the existing hardscape and excavating to install silva cells to support the new trees that will be installed. After the silva cells are installed irrigation lines and electrical conduit will be installed as the silva cells are backfilled. Once the silva cells are installed the hardscape will be installed.; NA; Excavation ROWArlington County · 2022
Permitted projects on public record. Addresses are omitted for privacy.