SAGRES CONSTRUCTION TO PROVIDE STORM AND SANITARY SEWER REPAIRS / EMERGENCIES THROUGHT OUT VARIOUS LOCATIONS IN THE COUNTY; NA; Excavation ROWArlington County · 2026
This project involves installing a liner inside the existing force main and constructing several access pits to complete the work. The contractor will need to access the pits located in front of the pump station at Military Road and 36th St. North. Additional access pits will be excavated along Military Road extending north to 38th St. North. Once the work reaches the intersection of 38th St. North and North Military Road, the project will transition to open cut trenching for the installation of new pipe. The open trench section will continue along 38th St. North from Military Road to North Oakland Street, and then from North Oakland Street to the dead end. After all pipe installation and lining activities are complete, the contractor will restore and repair all streets and surfaces impacted by construction.; NA; Transportation ROW - with excavationArlington County · 2026
Remove existing and install new sidewalk pavers. Sidewalk, and curbs repair works. ***PERMIT VALID TO OCCUPY THE ROW ON THE EAST SIDE OF S EADS ST BETWEEN 12TH ST S AND 15TH ST S FROM 03/30/26 THRU 06/19/26 MON-FRI 9AM-6PM DAILY WITH TEMPORARY 24HR CLOSURES WHEN NECESSARY FOR PARKING, SIDEWALK, AND BIKE LANE*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***CONTACT DSB WITHIN 72 BUSINESS HOURS OF COMMENCING OPERATIONS FOR NO PARKING SIGNS*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT*** ***NO PERSONAL VEHICLES WILL BE PERMITTED IN THE WORK AREA UNDER THIS PERMIT AND IS SUBJECT TO TICKET AND TOWING*** ***IF NEW DATES ARE NECESSARY, DON'T HESITATE TO GET IN TOUCH WITH DSB CUSTOMER SERVICE BEFORE PAYING THE INVOICE***; NA; Transportation ROW - with excavationArlington County · 2026
Storm Sewer Maintenance and repair; NA; Excavation ROW
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Arlington County · 2025
THE PROJECT CONSISTS OF INSTALLING A NEW, PARALLEL 12 INCHES SANITARY SEWER MAIN AND A NEW 8 INCHES WATER MAIN WITHIN THE N LEXINGTON ST RIGHT-OF-WAY (FROM 9TH ST N TO WILSON BLVD); NA; Excavation ROWArlington County · 2025
Installation of conduit for Fiber Connection for 1435 N Courthouse Rd; NA; Excavation ROWArlington County · 2025
THIS PROJECT IS LOCATED ALONG 23RD STREET SOUTH BETWEEN SOUTH FERN ST AND SOUTH EADS ST. THE PURPOSE OF THE LAND DISTURBING ACTIVITY IS TO REMOVE AND REPLACE CURB, GUTTER, SIDEWALKS, PAVEMENT, AND INSTALL ADA COMPLIANT CURB CUT RAMPS.; NA; Excavation ROWArlington County · 2025
THE WILSON BOULEVARD IMPROVEMENTS PHASE 3B ROAD PROJECT WILL CONSTRUCT CURB AND GUTTER, SIDEWALK, AND STREETSCAPE ELEMENTS TO IMPROVE SAFETY AND ACCESSIBILITY FOR PEDESTRIAN TRAVEL AND TO CALM VEHICULAR TRAFFIC. THIS TASK IS ALSO PART OF THE WILSON BLVD IMPROVEMENT PROJECT.; NA; Excavation ROWArlington County · 2025
THE WILSON BOULEVARD IMPROVEMENTS PHASE 3B ROAD PROJECT WILL CONSTRUCT CURB AND GUTTER, SIDEWALK, AND STREETSCAPE ELEMENTS TO IMPROVE SAFETY AND ACCESSIBILITY FOR PEDESTRIAN TRAVEL AND TO CALM VEHICULAR TRAFFIC. THIS TASK IS ALSO PART OF THE WILSON BLVD IMPROVEMENT PROJECT.; NA; Transportation ROW - with excavationArlington County · 2025
THE NEIGHBORHOOD COMPLETE STREETS: S. IRVING STREET BETWEEN 6TH STREET S. AND 7TH STREET S. CONSISTS OF CONSTRUCTION OF A PROPOSED SIDEWALK, INTERSECTION IMPROVEMENTS TO IMPROVE CROSSING SAFETY, AND ASSOCIATED STORM DRAINAGE FACILITIES. THE LIMITS OF WORK ARE WITHIN THE EXISTING ARLINGTON COUNTY R.O.W. WITH THE EXCEPTION OF A FEW LOCATIONS WHEREIN THE COUNTY WILL OBTAIN THE NECESSARY TEMPORARY EASEMENTS FROM THE PROPERTY OWNERS. THE TOTAL LIMITS OF DISTURBANCE IS 10,970 SF (0.2518 AC). THE TOTAL LIMITS OF WORK IS 25,508 SF (0.5856 AC). THERE ARE NO PRESENT FOODPLAINS OR RESOURCE PROTECTION AREAS ON THE PROJECT SITE.; NA; Excavation ROWArlington County · 2025
Arlington County WSS Contractor will responding to sanitary and storm sewer repair and emergency as needed at various locations throughout the county.; NA; Excavation ROWArlington County · 2025
Arlington County WSS Contractor will responding to sanitary and storm sewer repair and emergency as needed at various locations throughout the county.; NA; Transportation ROW - with excavationArlington County · 2025
Permitted projects on public record. Addresses are omitted for privacy.