Sidewalk widening, new curb ramps on three corners. There will be two new curb inlets installed to replace two existing structures that are then converted to manholes. There will be a short run of proposed storm sewer to connect one of the new curb inlets. This intersection will also have two new traffic signal poles and the accompanying infrastructure related to them. The project will include traffic signal work at the intersection of N Nash St and Langston Blvd EBL – three new traffic signal poles and pedestrian poles, among other signal infrastructure.; NA; Excavation ROWArlington County · 2026
Improvements of Water line, Sanitary Sewer Line, Storm Drain, Dominion, Communication, Street Lights, Traffic Signals, Roadway Reconstruction, and Sidewalk Reconstruction. ****RENEWAL OF TREX24-00300**** ***PERMIT VALID TO OCCUPY THE ROW ON COLUMBIA PIKE FROM S QUEEN ST TO S COURTHOUSE RD FROM 09/10/24 THRU 05/31/26 MON-FRI 7 AM-6 PM AND SAT 10 AM-6 PM DAILY, MUST HAVE A VALID NOISE EXEMPTION TO WORK OUTSIDE OF PERMITTED HOURS*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***CONTACT DSB WITHIN 72HRS OF COMMENCING OPERATIONS FOR NO PARKING SIGNS*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT***; NA; Transportation ROW - with excavationArlington County · 2025
Improvements of Water line, Sanitary Sewer Line, Storm Drain, Dominion, Verizon, Comcast, Arlington County Fiber, Street Lights, Traffic Signals, Roadway Reconstruction, and Sidewalk Reconstruction. ***PERMIT VALID TO OCCUPY THE ROW ON COLUMBIA PIKE FROM S ORME ST TO S OAK ST FROM 05/08/24 THRU 12/31/24 MON-SAT DAILY*** ***MUST OBTAIN A NOISE EXEMPTION FROM CODE ENFORCEMENT TO WORK AT THE REQUESTED HOURS*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***CONTACT DSB WITHIN 72 BUSINESS HOURS OF COMMENCING OPERATIONS FOR NO PARKING SIGNS*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT*** ***NO PERSONAL VEHICLES WILL BE PERMITTED IN THE WORK AREA UNDER THIS PERMIT AND IS SUBJECT TO TICKET AND TOWING***; NA; Transportation ROW - with excavation
Area served
Arlington County
Are you MILANI CONSTRUCTION LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Arlington County · 2024
Improvements of Water line, Sanitary Sewer Line, Storm Drain, Dominion, Communication, Street Lights, Traffic Signals, Roadway Reconstruction, and Sidewalk Reconstruction. ***PERMIT VALID TO OCCUPY THE ROW ON COLUMBIA PIKE FROM S QUEEN ST TO S COURTHOUSE RD FROM 03/11/24 THRU 09/09/25 MON-FRI 7 AM-6 PM AND SAT 10 AM-6 PM DAILY, MUST HAVE A VALID NOISE EXEMPTION TO WORK OUTSIDE OF PERMITTED HOURS*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***CONTACT DSB WITHIN 72HRS OF COMMENCING OPERATIONS FOR NO PARKING SIGNS*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT***; NA; Transportation ROW - with excavationArlington County · 2024
A new pedestrian bridge will be installed over Four Mile Run river parallel to the existing vehicular bridge. The sidewalks and signals will be modified to accommodate the new pedestrian route.; NA; Excavation ROWArlington County · 2023
A new pedestrian bridge will be installed over the Four Mile Run River parallel to the existing vehicular bridge. The sidewalks and signals will be modified to accommodate the new pedestrian route. ***PERMIT VALID TO OCCUPY THE ROW ON S ARLINGTON MILL DR AND SHIRLINGTON RD FROM 10/12/23 THRU 10/24/24 MON-FRI 9 AM-4 PM DAILY*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***MUST MANAGE THE CORRECT MOT AT ALL PHASES OF CONSTRUCTION*** ***MUST COORDINATE WITH TRANSIT WHEN OPERATIONS CONFLICT WITH THE STOP IN FRONT OF THE GAS STATION AND MUST CONTACT VDOT AND OBTAIN A PERMIT FOR WORK CONDUCTED ON THE RAMP EXIT OF 395***; NA; Transportation ROW - with excavationArlington County · 2023
No Parking Signs are to be installed within the county ROW in various locations along Columbia Pike. Work will include Waterline, Powerline, Sanitary, Storm Sewer, Communication lines, Curb and Gutter, Sidewalk, Driveway, Roadway, retaining walls. ***PERMIT VALID TO OCCUPY THE ROW ON COLUMBIA PIKE FROM S SCOTT ST TO S GARFIELD ST MON-FRI 7 AM-6 PM AND SAT 10 AM-6 PM DAILY*** ***ALL NO PARKING REQUESTS MUST BE MADE WITHIN 72HRS THROUGH DSB OR THE PROJECT COORDINATOR BEFORE WORK IS TO COMMENCE*** ***WORK SITE MUST MAINTAIN THE PROPER TTC AND MOT WHILE OPERATING IN THE ROW AND NO PERSONAL VEHICLES WILL BE PERMITTED TO PARK IN ANY OF THE WORK AREAS***; NA; Transportation ROW - with excavationArlington County · 2023
Improvements of Water line, Sanitary Sewer Line, Storm Drain, Dominion, Communication, Street Lights, Traffic Signals, Road way Reconstruction, Sidewalk Reconstruction; NA; Excavation ROWArlington County · 2023
Installation of construction trailer and utilities; New; Commercial NewArlington County · 2023$2,000
Improvements of Water line, Sanitary Sewer Line, Storm Drain, Dominion, Verizon, Comcast, Arlington County Fiber, Street Lights, Traffic Signals, Roadway Reconstruction, and Sidewalk Reconstruction. ***PERMIT VALID TO OCCUPY THE ROW ON COLUMBIA PIKE FROM S ORME ST TO S OAK ST FROM 05/08/23 THRU 05/07/24 MON-SAT DAILY*** ***MUST OBTAIN A NOISE EXEMPTION FROM CODE ENFORCEMENT TO WORK AT THE REQUESTED HOURS*** ***MUST MAINTAIN THE PROPER TTC AND MOT WHILE OPERATING IN THE ROW***; NA; Transportation ROW - with excavationArlington County · 2023
Improvements of Water line, Sanitary Sewer Line, Storm Drain, Dominion, Verizon, Comcast, Arlington County Fiber, Street Lights, Traffic Signals, Road way Reconstruction, Sidewalk Reconstruction; NA; Excavation ROWArlington County · 2023
No Parking Signs, are to be installed within the county ROW in various locations along Columbia Pike. ***PERMIT VALID TO OCCUPY THE ROW IN VARIOUS LOCATIONS FROM 07/18/22 THRU 06/26/25 MON-FRI 9 AM-4 PM SAT 10 AM-6 PM*** ***MUST HAVE PROPER TCP IN PLACE DURING OPERATIONS AND NO PERSONAL VEHICLES MAY BE PARKED IN WORK AREAS***; NA; Transportation ROW - with excavationArlington County · 2022
Permitted projects on public record. Addresses are omitted for privacy.