Trench, Install Water Line, Backfill, Restore roadway. 1. Saw cutting/pavement breakage 2. Pre-digging/excavating the trench 3. Providing shoring 4. Providing traffic control 5. Hauling off and dumping excavated/unsuitable backfill materials 6. Water Line Installation 7. Backfill 8. Temporary trench restoration; NA; Excavation ROWArlington County · 2022
Installation of new waterline relocation, water service lateral, sanitary sewer pipe laterals, and storm pipe laterals for proposed building.; NA; Transportation ROW - with excavationArlington County · 2022
New water, stormwater, and sanitary to new building; NA; PlumbingArlington County · 2022$375,000
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
1 DISHWASHER; 1 DRINKING FOUNTAIN; 12 LAVATORY; 10 SHOWER; 4 SINK; 3 WASHING MACHINE; 12 WATER CLOSET; 2 WATER PIPE; 2 GAS KITCHEN APPLIANCE; 6 GAS HEATING APPLIANCES; 3 GAS GRYER; 2 GASWATER HEATER; 2 GAS PIPE; 1 EMERGENCY GENERATOR INTERIOR ALTERATION FOR A NEW HOUSE. FIRE HOUSE IS A TENANT THAT WILL OCCUPY FLOORS 1 THRU 2 IN THE SOUTH TOWER APARMENT BUILDING-B1800902; COMArlington County · 2020$1,800,000
208 BATHROOM GROUPS, 104 DISHWASHERS, 3 DRINKING FOUNTAIN, 20 FLOOR DRAIN/SINKS, 1 HOSE BIB/WALL HYDRANT, 106 ICE MAKER, 55 LAVATORY, 34 ROOF/SURFACE/GARAGE DRAIN, , 109 SINKS (1 DOG WASH SINK), , 104 WASHING MACHINES, 55 WATER CLOSET, 106 GAS KITCHEN APPLIANCES, 1 GAS HEATING APPLIANCE (FURNACE), 2 GAS WATER HEATERS , 5 GAS PIPES, 1 EMERGENCY GENERATOR, 1 GAS ROOF TOP UNITS, INSTALLING 2PSI GAS FIXTURE COUNT JAH 2-19-20 7-Cleanouts. 104 Water Pipe. B1800881 - (NEW COMMERCIAL BUILDING); COMArlington County · 2020$2,537,793
Permitted projects on public record. Addresses are omitted for privacy.