Remove and Restore 64 Sq. Ft. of Damaged Asphalt. Note: Contractor would like to complete work as soon as possible.; NA; Transportation ROW - with excavationArlington County · 2025
Zayo proposes to directional bore 82' placing (2) 1.25" HDPE e/w (1) 72 fiber across Fairfax Dr., trench 18' placing (1) 4" HDPE e/w (1) 72 fiber and pull thru 98' placing (1) 72 fiber thru existing conduit along Fairfax Dr./N Monroe St. into building located at 3503 Fairfax Dr. Zayo proposes to overset (1) new 3'x5'x3' handhole and place (1) new 2'x3'x2' handhole. Old approved permit# EXCV24-01040 for renewal.; NA; Excavation ROWArlington County · 2025
Directional Bore 112' of (4) 1-1/2" HDPE e/w (1) 432 fiber and tracer wire.; NA; Excavation ROWArlington County · 2025
Trench 188' of (2) 1-1/4" PVC e/w (1) 48 fiber and tracer wire. Place (1) 3'x3'x3' MH; NA; Excavation ROWArlington County · 2025
Trench 432' of (2) 1-1/4" PVC e/w (1) 48 fiber and tracer wire. Place (1) 3'x3'x3' Manhole ***PERMIT VALID TO OCCUPY THE ROW ON CRYSTAL DR AND 26TH ST S FROM 04/07/25 THRU 04/18/25 MON-FRI 9AM-4PM DAILY*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***CONTACT DSB WITHIN 72 BUSINESS HOURS OF COMMENCING OPERATIONS FOR NO PARKING SIGNS*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT*** ***NO PERSONAL VEHICLES WILL BE PERMITTED IN THE WORK AREA UNDER THIS PERMIT AND IS SUBJECT TO TICKET AND TOWING*** ***IF NEW DATES ARE NECESSARY, DON'T HESITATE TO GET IN TOUCH WITH DSB CUSTOMER SERVICE BEFORE PAYING THE INVOICE***; NA; Transportation ROW - with excavationArlington County · 2025
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Directional Bore 219' of (4) 1-1/2" HDPE e/w (1) 432 fiber and tracer wire. Place (1) 3'x5'x3' Handhole.; NA; Excavation ROWArlington County · 2025
Directional Bore 240' of (2) 2" HDPE e/w (1) 144 fiber and tracer wire. Place (1) 2'x3'x3' Handhole and (1) 3'x3'x3' Manhole.; NA; Excavation ROWArlington County · 2024
Directional Bore 240' of (2) 2" HDPE e/w (1) 144 fiber and tracer wire. Place (1) 2'x3'x3' Handhole and (1) 3'x3'x3' Manhole.; NA; Transportation ROW - with excavationArlington County · 2024
Lane and sidewalk closure for work being done on private property. *** PERMIT VALID FOR #1850 COLUMBIA PIKE *** **** PROPER MAINTENANCE OF TRAFFIC (MOT) PLAN MUST BE IN PLACE WHILE WORKING OR WORK WILL BE SHUT DOWN **** ***** RIGHT-OF-WAY WORK HOURS: MON-FRI 9AM-4PM *****; Work in ROW; Transportation ROW - no excavationArlington County · 2024
Place 72' of (4) 1-1/2" HDPE e/w (1) 432 fiber and tracer wire. Construction was not completed due to Asphalt work. Requested dates are 9/3-9/6. +++ MUST CONTACT (dsbcustserv@arlingtonva.us) AT LEAST 3 BUSINESS DAYS IN ADVANCE FOR TEMPORARY "NO PARKING" SIGNS WITH PERMIT NUMBER, PICTURE(S) OF LOCATION(S), PARKING METER NUMBER(S), AND DATES, WHEN "NO PARKING" SIGNS ARE NEEDED +++ *** PERMIT VALID FOR N LYNN ST BETWEEN WILSON BLVD & 19TH ST N *** **** PROPER MAINTENANCE OF TRAFFIC (MOT) PLAN MUST BE IN PLACE WHILE WORKING OR WORK WILL BE SHUT DOWN **** ***** RIGHT-OF-WAY WORK HOURS: MON-FRI 9AM-4PM ****; NA; Transportation ROW - with excavationArlington County · 2024
Place 92' of (4) 1-1/2" HDPE e/w (1) 432 fiber and tracer wire. Construction was not complete due to WMATA scheduling; NA; Transportation ROW - with excavationArlington County · 2024
RENEWAL Place 1042' of (2) 2" HDPE e/w (1) 576 fiber and tracer wire. Place (2) 4'x4'x4' Manholes. ***PERMIT VALID TO OCCUPY THE ROW ON THE 2500 BLK OF S ADAMS ST AND THE 2300 BLK OF 26TH RD S FROM 02/09/24 THRU 03/08/34 MON-FRI 9 AM-4 PM DAILY*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***CONTACT DSB WITHIN 72HRS OF COMMENCING OPERATIONS FOR NO PARKING SIGNS*** ***IF NEW DATES ARE NECESSARY, PLEASE CONTACT DSB CUSTOMER SERVICE BEFORE PAYING THE INVOICE***; NA; Transportation ROW - with excavationArlington County · 2024
Permitted projects on public record. Addresses are omitted for privacy.