New Curb and Apron; NA; Transportation ROW - with excavationArlington County · 2025
New Curb & Apron; NA; Excavation ROWArlington County · 2025
Finished Basement to include a bedroom with egress window and well, and areaway. Build new one-story rear addition space with screened porch, and new second-floor addition above existing two-car garage.; Addition; Residential AdditionArlington County · 2024$650,000
2745SF INT.ALT. TO EXISTING BSMT & 1ST FLR W/NEW BSMT WET BAR. NEW 1468 SF 2ND FLR ADDITION OVER EXISTING FOOTPRINT OF SFD AND 2,608 SF EXTERIOR ALTERATIONS TO INCLUDE PAINTING EXISTING BRICK, REPLACING SIDING, NEW WINDOWS AND DOORS; RADDArlington County · 2022$500,000
New Proposed Apron and concrete sidewalk, as well as re-install of curb & gutter for new single-family home build. LDA18258; NA; Excavation ROWArlington County · 2020
PARK AND OPERATE CONSTRUCTION EQUIPMENT WITH A SIDEWALK CLOSURE FOR INSTALLATION OF NEW CURB & GUTTER FROM 9AM-4PM WITH THE PROPER TRAFFIC CONTROL PLANArlington County · 2019
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.