What the public permit record shows, not self-reported reviews.
Is ESPINA PAVING INC a real contractor?
ESPINA PAVING INC appears in public building-permit records with 8 permits filed through 2026 in and around Arlington County, VA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ESPINA PAVING INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ESPINA PAVING INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ESPINA PAVING INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ESPINA PAVING INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ESPINA PAVING INC's work?
The most recent permit on record for ESPINA PAVING INC is dated 2026-01-26, with 8 permits on file in total.
Recent permitted projects
County Mill and Pave with Full Depth County Contract # C26199; NA; Transportation ROW - with excavationArlington County · 2026
County Mill and Pave with Full Depth Rebuild. County Contract # C26199; NA; Excavation ROWArlington County · 2026
MILL AND ASPHALT OVERLAY COUNTY WIDE +++MUST APPLY FOR AN EXCV PERMIT IN CONJUNCTION WITH THIS PERMIT+++ ***PERMITS VALID TO OCCUPY THE ROW IN VARIOUS SOUTHSIDE LOCATIONS FROM 04/01/25 THRU 12/31/25 MON-FRI 9AM-4PM DAILY, MUST APPLY FOR A NOISE EXEMPTION TO WORK OUTSIDE OF THE STANDARD APPROVED HOURS*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT*** ***NO PERSONAL VEHICLES WILL BE PERMITTED IN THE WORK AREA UNDER THIS PERMIT AND IS SUBJECT TO TICKET AND TOWING*** ***IF NEW DATES ARE NECESSARY, DON'T HESITATE TO GET IN TOUCH WITH DSB CUSTOMER SERVICE BEFORE PAYING THE INVOICE***; Work in ROW; Transportation ROW - no excavationArlington County · 2025
REQUIRE SPACE FOR TRAILORS AND TRUCKS IN FRONT OF 2135 N TAYLOR ST STARTING ON TUESDAY, MAY 14, 2013 THRU FRIDAY, MAY 17, 2013 FROM 9AM TO 4PM EACH DAY. REQUIRE NO PARKING SIGNS TO RESERVE SPACES. NEED A FLAG MAN TO CONTROL TRAFFIC WHILE OPERATION IS GOING. NEED PROPER TRAFFIC CONTROL FOR VEHICLES AND PEDESTRIANS.Arlington County · 2013
FULL DEPTH RECONSTRUCTION OF ALL FOUR COURTS A, B, C, D. INCLUDES: - EXCAVATION OF COUNTY'S ROW FROM CURB TO CURB 13-INCHES DOWN TO SUB GRADE LEVEL - GRADE AND COMPACTION OF 6-INCHES OF AGGREGATE MATERIAL. - GRADE AND COMPACTION OF 5-INCHES OF BASE ASPHALT. - GRADE AND COMPACTION OF 2-INCHES OF SURFACE ASPHALT. ***PERMIT VALID TO OCCUPY THE ROW IN VARIOUS SOUTHSIDE LOCATIONS TO MILL AN D PAVE FROM 09/01/25 THRU 09/30/25 MON-FRI 7AM-5PM DAILY*** ***MUST MAINTAIN THE PROPER TTC AND MOT AND MUST BE ABLE TO PROVIDE A DIGITAL OR HARD COPY OF THIS PERMIT WHILE OPERATING IN THE ROW*** ***MUST MAINTAIN AND REMOVE ALL TEMPORARY TRAFFIC CONTROL DEVICES FROM THE ROW UPON COMPLETION OF THE PROJECT*** ***NO PERSONAL VEHICLES WILL BE PERMITTED IN THE WORK AREA UNDER THIS PERMIT AND IS SUBJECT TO TICKET AND TOWING*** ***IF NEW DATES ARE NECESSARY, DON'T HESITATE TO GET IN TOUCH WITH DSB CUSTOMER SERVICE BEFORE PAYING THE INVOICE***; NA; Transportation ROW - with excavation
Area served
Arlington County
Use this data — free
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ESPINA PAVING INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to ESPINA PAVING INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Arlington County · 2025
FULL DEPTH REPAIR RECONSTRUCTION TO BE MADE OVER SOUTH FOR MILE RUN COURTS A, B, C & D; NA; Transportation ROW - with excavationArlington County · 2025
FULL-DEPTH ROAD REPAIR/ Rebuild. Milling out 13 inches of an existing pavement. Put back 6 inches of 21-A, 5 inches of base asphalt and 2 inches of asphalt topping.; NA; Excavation ROWArlington County · 2024
Arlington County Contractor "ESPINA ASPHALT INC." will come in to do the milling and paving operation on the assign streets by the Arlington County Project Officer. Street will be closed off until the work is done or after the end of the workday.; NA; Excavation ROWArlington County · 2023
Permitted projects on public record. Addresses are omitted for privacy.