TEMP CLOSE N MOORE ST. BETWEEN 19TH ST. N AND LANGSTON BLVD TO PLACE A MOBILE CRANE AND TRUCKS TO HOIST MATERIALS AND EQUIPMENT; Work in ROW; Transportation ROW - no excavationArlington County · 2026
TEMP OCCUPY N TAYLOR ST. BETWEEN FAIRFAX DR. AND DEAD END TO PLACE A MOBILE CRANE AND TRUCKS TO HOIST EQUIPMENT AND MATERIALS; Work in ROW; Transportation ROW - no excavationArlington County · 2024
TEMP CLOSE N MOORE ST. BETWEEN 19TH ST N AND LANGSTON BLVD. TO PLACE A MOBILE CRANE AND TRUCKS TO ASSEMBLE A TOWER CRANE; Work in ROW; Transportation ROW - no excavationArlington County · 2024
We are placing a mobile crane on Crystal Drive to remove towing crane at 190 Crystal Drive and closing the sidewalk for pedestrian safety. *** PERMIT VALID TO OCCUPY THE ROW ON CRYSTAL DR BETWEEN 18TH ST S AND 20TH ST S 02/11/23 AND 02/12/23 24HRS WITH A DETOUR IN PLACE DURING OPERATIONS *** *** MUST MAINTAIN THE PROPER TCP AND TTC WHILE OCCUPYING THE ROW ***; Work in ROW; Transportation ROW - no excavationArlington County · 2023
To temp occupy Fort Myer Drive between Fairfax Drive and Wilson Blvd to place a 550 ton crane to hoist 2 RTU's; Work in ROW; Transportation ROW - no excavationArlington County · 2023
1.To temp occupy Potomac Ave between 33rd Street and 35th Street to place a 300 ton crane to hoist HVAC equipment to the roof. 2. To temp close 33rd Street between S Ball Street and Potomac Ave to place a 300 ton crane to hoist HVAC to the roof. *** PERMIT VALID FOR POTOMAC AVE BETWEEN 33RD ST S & 35TH ST S; AND 33RD STS BETWEEN S BALL ST & POTOMAC AVE *** **** PROPER MAINTENANCE OF TRAFFIC (MOT) PLAN MUST BE IN PLACE WHILE WORKING **** ***** PERMIT VALID FOR SATURDAY FEBRUARY 11, 2023; 7AM-7PM *****; Work in ROW; Transportation ROW - no excavation
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
Arlington County · 2023
To temp occupy S Ball Street between 33rd Street and 35th Street to place a 75 ton crane to hoist material to rooftop. *** PERMIT VALID FOR S BALL ST BETWEEN 33RD ST S & 35TH ST S *** **** PROPER MAINTENANCE OF TRAFFIC (MOT) PLAN MUST BE IN PLACE WHILE WORKING **** ***** PERMIT VALID FOR SATURDAY 01/07/23; 7AM-7PM *****; Work in ROW; Transportation ROW - no excavationArlington County · 2023
To temp occupy S Hayes Street between 15th Street S & 12th Street S to place a 300-ton crane to hoist landscaping. ***PERMIT VALID TO OCCUPY THE ROW AT 1201 S HAYES ST CLOSING (2) TRAVEL LANES, THE BIKE LANE, SIDEWALK, AND THE PARKING LANE ON 12/17/22 FROM 7 AM-7 PM*** ***MUST MAINTAIN THE PROPER TCP AND TTC WHILE OPERATING IN THE ROW***; Work in ROW; Transportation ROW - no excavationArlington County · 2022
To temp occupy 19th Street N between N Arlington Ridge Road & N Kent Street to place a 75 ton crane to hoist steel to the window; Work in ROW; Transportation ROW - no excavationArlington County · 2022
We are placing a mobile crane on 18th Street S to remove the existing tower crane at 1900 Crystal Drive, and closing the sidewalk for pedestrian safety. Crane will remain overnight. Dates are contingent upon weather, availability of materials to complete the work, and approved hours from code enforcement. Dates may change. Back-up dates are 12/02-12/04, 12/09-12/11, and 12/16-12/19. ***PERMIT VALID TO OCCUPY THE ROW ON 18TH ST S BETWEEN CRYSTAL DR. AND S BELL ST 12/09/22 THRU 12/11/22 FRI-SUN 7 AM-10 PM 24HRS CONTINGENT ON NOISE EXEMPTION APPROVAL, DETOUR WILL BE IN PLACE DURING CLOSURE*** ***MUST MAINTAIN THE PROPER TCP AND TTC WHILE OPERATING IN THE ROW***; Work in ROW; Transportation ROW - no excavationArlington County · 2022
To temp occupy N Glebe Road between Fairfax rive and Wilson Blvd to place a 155 ton crane to hoist HVAC equipment; Work in ROW; Transportation ROW - no excavationArlington County · 2022
To temp close S Orme Street between Southgate Road & Columbia Pike to place a 175-ton crane to hoist communication equipment to the roof. ***PERMIT VALID TO OCCUPY THE ROW ON 10/15/22 WITH A CONTINGENT DATE OF 10/16/22*** ***MUST MAINTAIN THE PROPER TCP AND TTC WHILE OCCUPYING THE ROW, IF WORK NEEDS TO BE EXTENDED TO 10/16/22 THE TRAVEL LANES AND SIDEWALK MUST BE OPENED FOR FREE FLOW OVERNIGHT***; Work in ROW; Transportation ROW - no excavationArlington County · 2022
Permitted projects on public record. Addresses are omitted for privacy.