INSTALL OF CONDUIT AND BOXES IN CONCRETE SLABS FOR POWER AND LIGHTING. INSTALLING SLEAVES THROUGH CONCRETE DECK FOR POWER, LOW VOLTAGE AND LIGHTING.; NA; ElectricalArlington County · 2025$25,000
Gym remodel. Relocation of devices, lighting, and service panel.; NA; ElectricalArlington County · 2025$40,000
200AMP TEMPORARY SERVICE; NA; ElectricalArlington County · 2025$5,000
TEMPORARY SERVICE FOR CONNECTING TOWER CRANES TO A GENERATOR.; NA; ElectricalArlington County · 2024$5,000
1600A 480V TEMPORARY SERVICE CONTAINER FOR NEW CONSTRUCTION TRAILER; NA; ElectricalArlington County · 2024$10,000
LOW VOLTAGE FOR DAS (DISTRIBUTED ANTENNAE SYSTEM); NA; ElectricalArlington County · 2023$30,000
SWITCHBOARD MSBA 4000A SERVICE. MUST HAVE SEPARATE PERMIT PER INSPECTOR GREEN.; NA; ElectricalArlington County · 2023$4,000
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
6 FLOORS LOW VOLTAGE (PHONE, DATA, TV) 1 SERVICE 1600 AMPS, 1 SERVICE 1600-3000 AMPS,87 SUB PANELS, 1650 CIRCUITS, 205 RECEPS >20 AMPS, 5500 RECEPS, SWITCHES AND DEVICES, 539 FIXED APPLIANCES, 1 Generator. 88 Disconnects. 78 meters. 79 Water Heaters. NEW 77 UNIT APARTMENT BUILDING WITH GARAGE FOR AHC LP 30 ARLINGTON VIEW. B2002660; COMArlington County · 2022$1,000,000
Install emergency two way commnunication system in new multi-family apartment building B2002660; COMArlington County · 2022$32,000
1 FIRE ALARM CONTROL PANEL; 1 ANNUNCIATOR PANEL; 25 INITIATING DEVICES; 325 SIGNALING DEVICES; 6 BOOSTER PANELS; 32,000 SQ FT - INSTALL NEW FIRE ALARM SYSTEM IN 77 UNIT APARTMENT BUILDING WITH GARAGE NEW 77 UNIT APARTMENT BUILDING WITH GARAGE SPECIAL INSPECTIONS REQUIRED 6/25/21- ZONING APPROVAL, DC: 1) Administratively-approved FBC applications, approved after September 24, 2016, will expire in 3 years from the date of the Zoning Administrator's Letter of Approval unless a Footing to Grade permit has been issued; however, the Zoning Administrator may extend the approval up to 3 years for a total of up to 6 years if he/ she finds that the applicant has been actively working in good faith to pursue the Footing to Grade permit. 2) Prior to any approval of a request for a partial Certificate of Occupancy (CO) of any new elevator building, a shell and core CO is required. Typically, an application for the master CO is submitted at the same time as the application for the shell and core. Note: The shell and core CO shall not be issued until the building support systems such as the fire alarm system, elevators, restrooms, ventilating system and exit-ways have been inspected and approved. 3) A master CO is required for the entire building and site work. Note: A request for a certificate for partial occupancy of a building may be made after the filing of the applications for the master CO and shell & core CO. 4) As noted in the letter dated January 21, 2020, all required easements, dedications, vacations and encroachments applications shall be approved, executed and recorded prior to issuance of the first CO for tenant occupancy. 5) As noted in the letter dated January 21, 2020, approval of a final site lighting plan, garage lighting plan meeting CPTED standards and a final sign plan is required prior to issuance of the first CO for tenant occupancy. 6) A final plat is required prior to approval of the master CO.; COMArlington County · 2022$32,000
7 FLOORS LOW VOLTAGE, POOL BONDING, 310 SERVICES 0-500 AMPS, 12 SERVICES 500-1600 AMPS, 1 SERVICE 1600-3000 AMPS, 12 METERS, 24 SUB-PANELS, 5,217 CIRCUITS, 620 RECEPS >20 AMPS, 18,755 RECEPS, SWITCHES AND DEVICES, 2,170 FIXED APPLIANCES, 310 MOTORS 1/4-5 HP, 20 MOTORS 6-25 HP, 1 GENERATOR OVER 50 KW CONSTRUCT NEW 7-STORY MULTIFAMILY BUILDING, 2 LEVELS BELOW GRADE, 310 UNITS. LOW VOLTAGE FOR Data, Phone, CCTV. B2001274; COMArlington County · 2022$5,000,000
1 SUB PANEL; COMArlington County · 2021$2,000
Permitted projects on public record. Addresses are omitted for privacy.