FOR A MECHANICAL SYSTEM UPGRADE TO A PORTION OF AN EXISTING STRUCTURE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.**City of Philadelphia · 2026
INSTALLATION OF NEW AHU, UNIT HEATERS, AND EXHAUSTS IN EXISTING DECHLORINATION BUILDINGCity of Pittsburgh · 2026$5,000
PROVIDE NEW BOILER IN EXISTING SCHOOL.City of Pittsburgh · 2025$1,500,000
INSTALLATION OF COMPLETE NEW MECHANICAL SYSTEM WITH RTUS, MAUS, EXHAUSTS, UNIT HEATERS, AND DUCTWORK AS PART OF CONSTRUCTION OF NEW CHEMICAL STORAGE BUILDINGCity of Pittsburgh · 2025$990,000
NEW EXHAUSTS AND INTAKES AS PART OF REPLACEMENT OF EXISTING NATURAL GAS GENERATOR WITH NEW DIESEL GENERATORCity of Pittsburgh · 2025$60,000
REPLACE STEAM HEATING SYSTEM WITH HOT AND CHILLED WATER SYSTEM INCity of Pittsburgh · 2025$4,500,000
STAND ALONE PERMIT TO INSTALL A SINGLE BLOWER UNIT AND ASSOCIATED PIPING
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Pittsburgh · 2025
$27,500
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
ALTERATIONS TO HVAC SYSTEM WITHIN THIRD FLOOR OF EXISTING HOSPITAL BUILDING (CHOP MAIN BUILDING) AS PER APPROVED PLANS AND PA DOH APPROVAL. *2018 IMC REVIEW*City of Philadelphia · 2025
MECHANICALCity of Pittsburgh · 2025$10,000
ALTERATION TO THE MECHANICAL SYSTEM IN RELATION TO BDA-2025-01253. WORK INCLUDES INTERIOR EQUIPMENT, DUCTWORK AND HYDRAUNIC SYSTEM.City of Pittsburgh · 2025$350,000
ALTERATION TO THE EXISTING MECHANICAL SYSTEM IN RELATION TO BDA-2025-01524. WORK INCLUDES NEW INTERIOR EQUIPMENT, DUCTWORK, HYDRAUNIC SYSTEM AND EXHAUST SYSTEM ELEMENTS.City of Pittsburgh · 2025$1,700,000