City Funded Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 60 days from award date.
3. ACHD asbestos application required – Survey included
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Lowest Combined Bid With: 10 GRAPE, 236 STERLING, & 18 GRAPE
9. Foundation Walls RemainCity of Pittsburgh · 2026$40,000
City Funded Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 60 days from award date.
3. ACHD asbestos application required – Survey included
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Lowest Combined Bid With: 18 GRAPE, 226 ROCHELLE, & 236 STERLING
9. Foundation Walls RemainCity of Pittsburgh · 2026$38,000
City Funded Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 60 days from award date.
3. ACHD asbestos application required – Survey included
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Lowest Combined Bid With: 10 GRAPE, 226 ROCHELLE, & 18 GRAPE
9. Foundation Walls RemainCity of Pittsburgh · 2026
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$40,000
City Funded Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 60 days from award date.
3. ACHD asbestos application required – Survey included
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Lowest Combined Bid With: 10 GRAPE, 226 ROCHELLE, & 236 STERLING
9. Foundation Walls RemianCity of Pittsburgh · 2026$69,500
City Funded Demolition
1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing.
2. Contract term 80 days. Start Date: 1/21/2026, 11:30 PM. Contract ending date: 4/11/2026 11:30 PM
3. ACHD asbestos application required
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pictures must be taken of neighboring structures and sidewalk before demolition can begin.
8. Party-Wall Structure. All current contract specifications apply for party wall restoration. – Walls must be repaired and parged per articles of agreement – This is to include finishing the porch & adding down spots to the gutter system for proper water termination. No alternative will be accepted. Any change orders for unforeseen wall repair must be approved & signed before work is to begin.
9. Adjacent basement walls must be parged and water proofed to prevent water drainage in neighboring structures
10. Structure must be made safe within 48 hrs.
11. City regulations limit demolition work to the hours of 7 a.m. through 8 p.m.
12. Foundation Walls RemainCity of Pittsburgh · 2026$107,000
City Funded Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 90 days from award date.
3. ACHD asbestos application required – Survey included
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Foundation walls remainCity of Pittsburgh · 2025$35,000
City Funded Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 90 days from award date.
3. ACHD asbestos application required – Survey included
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Foundation walls remainCity of Pittsburgh · 2025$25,000
City Funded Demolition
1. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing from lot.
2. Contract term 90 days from award date.
3. ACHD asbestos application required – Survey included
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structure and sidewalk before demolition can begin.
8. Foundation Walls RemainCity of Pittsburgh · 2025$39,000
City Funded Demolition
1. CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing.
2. Contract term 30 days. Start Date: 7/30/2025, 3:00 PM. Contract ending date: 8/29/2025 3:00 PM
3. ACHD asbestos application required
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pictures must be taken of neighboring structures and sidewalk before demolition can begin.
8. Structure must be made safe within 96 hours
9. Foundation walls remainCity of Pittsburgh · 2025$52,000
City Funded Demolition
1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing.
2. Contract term 10 days. Start Date: 4/27/2025, 8:00 AM. Contract ending date: 5/7/2025 8:00 AM
3. ACHD asbestos application required
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pictures must be taken of neighboring structures and sidewalk before demolition can begin.
8. Foundation Walls RemainCity of Pittsburgh · 2025$14,300
1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing.
2. Contract term 10 days. Start Date: 3/24/2025, 3:00 PM. Contract ending date: 4/3/2025 3:00 PM
3. ACHD asbestos application required
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pictures must be taken of neighboring structures and sidewalk before demolition can begin.
8. Structure must be made safe within 24 hrs
9. Foundation walls remainCity of Pittsburgh · 2025$53,000
City Funded Demolition
1. EMERGENCY CURB-SIDE DEMOLITION. Remove all garbage and debris, vegetation, concrete slabs, accessory structures, steps and fencing.
2. Contract term 10 days. Start Date: 12/13/2024, 3:00 PM. Contract ending date: 12/23/2024 3:00 PM
3. ACHD asbestos application required
4. Void to be filled with clean material.
5. Lot shall be graded to match adjacent lots, and so that water is diverted away from neighboring structures.
6. Fence off entire length of parcel to pedestrian traffic using 6-foot barricade fencing.
7. Pre-Inspection Pictures must be taken of neighboring structures and sidewalk before demolition can begin.
8. Structure must be made safe within 24 hrs
9. Foundation walls remainCity of Pittsburgh · 2024$63,000
Permitted projects on public record. Addresses are omitted for privacy.