Suppression System PermitCity of Pittsburgh · 2023$3,000
ALTERATION TO THE EXISTING WATER-BASED WET/DRY SPRINKLER SYSTEM IN RELATION TO BP-2023-02043. WORK INCLUDES SPRINKLER HEADS AND PIPINGCity of Pittsburgh · 2023$4,000
Suppression System PermitCity of Pittsburgh · 2023$8,000
ALTERATIONS TO SPRINKLER SYSTEM TO ACCOMMODATE FIRST FLOOR TENANT FIT-OUTCity of Pittsburgh · 2023$6,400
RELOVATION AND CHANGE IN LAYOUT TO EXISTING SPRINKLERS FOR NEW ROOM LAYOUTCity of Pittsburgh · 2023$29,000
ALTERATIONS TO FIRE SUPPRESSION SYSTEM; RELOCATE 229 HEADS (FROM UP FACING TO DOWN FACING), REMOVE 71 HEADS, AND 63 HEADS TO REMAIN UNCHANGED UP FACING IN PORTION OF SHOPPING CENTER TENANT SPACE.City of Pittsburgh · 2023$79,000
RELOCATION AND ADDITION OF EXISTING HEADS TO NEW ROOM AND CEILING LAYOUT.City of Pittsburgh · 2023
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
$6,200
INSTALLATION OF NEW NFPA 13 SPRINKLER SYSTEM THROUGHOUT THE BUILDING WITH NEW FDC AT EXTERIOR.City of Pittsburgh · 2023$39,000
RELOCATE EXISTING SPRINKLERS & ADD NEW SPRINKLER HEADS IN 3,109 SF ON FIRST FLOOR OF EXISTING ONE-STORY STRUCTURE AS ANIMAL CARE.City of Pittsburgh · 2022$11,000
ALTERATION OF EXISTING SYSTEM - NEW AND RELOCATED SPRINKLERS AND SPRINKLER PIPING AT UNIT 501 IN A 13-STORY STRUCTURE - RELATED TO BP-2022-06909City of Pittsburgh · 2022$5,400
MODIFICATIONS TO EXISITNG SYSTEM INCLUDING SPRINKLER HEADS AND PIPING AT THE 3RD FLOOR OF AN 8-STORY STRUCTURE - RELATED TO BP-2021-14585City of Pittsburgh · 2022$3,900
ALTERATION TO EXISTING SYSTEM INCLUDING RELOCATION OF EXISTING AND 5 NEW SPRINKLER HEADS AT 6TH FLOOR OF A 7-STORY STRUCTURE - RELATED TO BP-20210-20177City of Pittsburgh · 2022$9,000
Permitted projects on public record. Addresses are omitted for privacy.