What the public permit record shows, not self-reported reviews.
Is ZURAB ODIKADZE a real contractor?
ZURAB ODIKADZE appears in public building-permit records with 285 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ZURAB ODIKADZE's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ZURAB ODIKADZE by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ZURAB ODIKADZE licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ZURAB ODIKADZE has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ZURAB ODIKADZE's work?
The most recent permit on record for ZURAB ODIKADZE is dated 2026-05-15, with 285 permits on file in total.
ALTERATIONS TO RESTAURANT. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANSCity of Philadelphia · 2026
Installation of sewer, sanitary and water supply piping to fixture units: 1-water heater, 1-laundry sink.City of Philadelphia · 2026
Installation of sewer, sanitary and eater supply piping to fixture unites: 1-water closet, 1-bathtub, 1-lavatory, 1-kitchen sink, 1-laundry & 1-water heater.City of Philadelphia · 2026
Installation of sewer, sanitary and water supply piping to fixture units: 1-water closet, 1-bathtub, 1-lavatory, 1-kitchen sink, 1-laundry, 1-water heater.City of Philadelphia · 2026
Installation sewer, sanitary and water supply piping to fixture unites: 3-water closet, 3-lavatory sink, 1-shower, 1-bathtub, 1-kitchen sink, 1-laundry, 1-water heater.City of Philadelphia · 2026
Installation of sewer, sanitary and water supply piping to fixture unites: 3-water closet, 3-lavatory sink, 1-bathtub, 1-shower, 1-laundry sink, 1-kitchen sink, 1-water heater.City of Philadelphia · 2026
Plumbing Permit (Interior) for combo RP-2026-000504
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ZURAB ODIKADZE?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2026
Installation of sewer, sanitary and water supply piping to fixture unites: 3-water closet, 3-lavatory sink, 1-bathtub, 1-shower, 1-laundry, 1-kitchen sink, 1-water heaterCity of Philadelphia · 2026
ALTERATIONS TO TRIPLEX. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANSCity of Philadelphia · 2026
NEW CONSTRUCTION OF 42 UNIT APARTMENT BUILDING. EXTERIOR INSTALLATION OF CURB TRAP, FAI, MAIN DRAIN, AND 1 1/2" WATER DISTRIBUTION PIPE. INTERIOR INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR LISTED FIXTURES. ALL MATERIALS SHALL BE METALLIC TO ROOF EXTENSION. VENTING TO BE DESIGNED AND INSTALLED IN ACCORDANCE WITH SECTION 919 PHILADELPHIA SINGLE STACK VENT SYSTEM. ALL WORK TO BE INSTALLED IN STRICT COMPLIANCE WITH 2018 PPC AND APPROVED PLANSCity of Philadelphia · 2026
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.City of Philadelphia · 2026
Installation 0f sewer, sanitary and water supply piping to fixture unites: 2-water closet, 2-lavatory sink, 1-shower, 1-bathtub, 1-kitchen sink, 1-laundry, 1-water heater.City of Philadelphia · 2026
Permitted projects on public record. Addresses are omitted for privacy.