What the public permit record shows, not self-reported reviews.
Is ZI BIN TANG a real contractor?
ZI BIN TANG appears in public building-permit records with 26 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is ZI BIN TANG's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to ZI BIN TANG by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is ZI BIN TANG licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. ZI BIN TANG has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is ZI BIN TANG's work?
The most recent permit on record for ZI BIN TANG is dated 2025-10-20, with 26 permits on file in total.
FOR LEGALIZATION OF LEVEL III INTERIOR ALTERATIONS AND THE ERECTION OF A 3RD STORY ADDITION. FOR USE AS ONE (1) COMMERCIAL SPACE (SEE ZP-2024-005430 AND AP-2024-005618 FOR APPROVED CHANGE IN USE & OCCUPANCY TO RETAIL SALES OF CONSUMER GOODS) AND THREE (3) DWELLING UNITS (GROUP R-2). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK. SEE AP#822780 AND ZP-2025-003536 FOR ASSOCIATED ZONING APPROVAL OF ADDITION.City of Philadelphia · 2025
NEW CONSTRUCTION OF A THREE-STORY BUILDING WITH BASEMENT AND ROOF ACCESS STRUCTURE (NO ROOF DECK) FOR USE AS SHELL COMMERCIAL SPACE (USE REGISTRATION & FIT-OUT PERMITS REQUIRED PRIOR TO OCCUPANCY) AND SEVENTEEN (17) DWELLING UNITS AS PER APPROVED PLANS. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. WORK TO INCLUDE UNDERPINNING TO BE MONITORED BY A PA LICENSED PE AT ALL TIMES. *2018 IBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2024
Visitor AccommodationsCity of Philadelphia · 2024
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you ZI BIN TANG?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.City of Philadelphia · 2024
FOR LEVEL II INTERIOR ALTERATIONS WITH A PARTIAL CHANGE IN OCCUPANCY TO GROUP R-2 THREE (3) FAMILY DWELLING AT THE 2ND FLOOR. 1ST FLOOR & MEZZANINE TO REMAIN VACANT COMMERCIAL SPACE (SEPARATE PERMITS REQUIRED FOR FIT-OUT & C.O.). BUILDING TO BE FULLY SPRINKLERED PER NFPA 13. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC AND PHC APPROVAL. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.
[AMENDMENT 9/12/2025 FOR MINOR LAYOUT CHANGES AS PER APPROVED AMENDED PLANS.]City of Philadelphia · 2024
FOR LEVEL 3 ALTERATIONS TO AN EXISTING ATTACHED STRUCTURE AS PER PLANS. FOR THREE (3) DWELLING UNITS WITH LAYOUT AS SHOWN. THE ENTIRE BUILDING MUST BE PROTECTED WITH AN NFPA 13R SYSTEM. SEPARATE PERMITS ARE REQUIRED FOR ALL MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.
AMENDMENT APPROVED AS OF 10/18/2024:
FOR THE CHANGES IN INTERIOR LAYOUT AS PER AMENDED PLANS.
AMENDMENT APPROVED AS OF 01/15/2025:
FOR THE CHANGES IN INTERIOR LAYOUT AT BASEMENT, 1ST FLOOR AND 3RD FLOOR AS PER AMENDED PLANS.City of Philadelphia · 2024
FOR LEVEL II ALTERATION TO ADD ADDITIONAL 5 UNITS (8 TOTAL) TO INCLUDE NEW PARTITIONS, DOORS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. BUILDING TO SPRINKLERED PER NFPA 13R MINIMUM. SEPARATE PERMIT REQUIRED FOR MEP AND FIRE SUPPRESSION WORK. IEBC 2018City of Philadelphia · 2023
FOR THE INSTALLATION OF HVAC EQUIPMENT, APPLICANCES, DUCTWORK AND REGISTRERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2023
FOR NEW CONSTRUCTION OF A THREE-STORY ATTACHED BUILDING WITH CELLAR FOR USE AS MULTI-FAMILY HOUSEHOLD LIVING (THREE DWELLING UNITS). BUILDING TO FULLY SPRINKLERED WITH NFPA 13R MINIMUM. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SPRINKLER.City of Philadelphia · 2022
FOR THE ERECTION OF AN ATTACHED STRUCTURE WITH ROOF DECK AND ROOF DECK ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION/PLAN.City of Philadelphia · 2022
Permitted projects on public record. Addresses are omitted for privacy.