What the public permit record shows, not self-reported reviews.
Is YCP INC a real contractor?
YCP INC appears in public building-permit records with 68 permits filed through 2018 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is YCP INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to YCP INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is YCP INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. YCP INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is YCP INC's work?
The most recent permit on record for YCP INC is dated 2018-01-29, with 68 permits on file in total.
INSTALLATION OF ONE 6,000 GALLON GASOLINE AND ONE 10,000 GALLON DIESEL FUEL UNDERGROUND STORAGE TANK UST CONCRETE PIPING AS PER PLANS.City of Philadelphia · 2018
REMOVE/DISPOSE TWO (2) 20,000 GALLON FUEL OIL UST'S. INSTALLATION TWO (2) 20,000 GALLON FUEL OIL UST'S IN THE SAME EXCAVATION.City of Philadelphia · 2017
LIMITED SITE EXCAVATION / SUBGRADE PREP AND INSTALLATION OF ONE (1), 5,000 GALLON DOUBLE-WALL STEEL UNDERGROUND FUEL OIL STORAGE TANK WITH ASSOCIATED PIPING AND MONITORING SYSTEM PER PLANS. ALL WORK SHALL BE IN ACCORDANCE WITH PADEP REGULATIONS AND NFPA 30 AND 31. FUEL SEPARATE PERMITS REQUIRED FOR ANY ELECTRICAL OR PLUMBING WORK.City of Philadelphia · 2017
REVISE PERMIT NUMBER 795878 TO REFLECT ACCURATE ADDRESS TO 3800 POWELTON AVE.City of Philadelphia · 2017
INSTALLATION OF ONE (1)- 5000 GALLON UNDERGROUND FUEL OIL STARAGE TANK, AS PER APPROVED PLANS. ALL WORK TO BE IN ACCORDANCE WITH PENNSYLVANIA D.E.P. REGULATIONS, ALL APPLICABLE CODES, NFPA 30 AND NFPA 31.City of Philadelphia · 2017
INSTALLATION OF 1 1000 GALLON ABOVEGROUND PROPANE STORAGE TANK.(NON PARKING AREA).City of Philadelphia · 2017
FOR THE REMOVAL OF ONE (1) 12,000 GALLON FUEL OIL UNDERGROUND STORAGE TANK AND FOR THE INSTALLATION OF ONE (1) 5,000 GALLON FUEL OIL UNDERGROUND STORAGE TANK WITH MONITORING AND PIPING. ALL WORK TO BE DONE IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS AND APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you YCP INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2016
REMOVAL OF ONE (1) 5,000 GALLON POTASSIUM DEICER ABOVE GROUND STORAGE TANK AND INSTALLATION OF ONE (1) 10,000 GALLON POTASSIUM DEICER ABOVE GROUND STORAGE TANK ON THE SAME CONCRETE SLAB AT AN EXISTING AIRPORT FACILITY AS PER APPROVED PLANS.City of Philadelphia · 2016
FOR THE REMOVAL OF AN EXISTING 5,000 GALLON ABOVE GROUND STORAGE TANK AND THE INSTALLATION OF ONE (1) 10,000 GALLON ABOVE GROUND STORAGE TANK. SIZE AND LOCATION AS SHOWN IN APPLICATION. FOR USE AS STORAGE ACCESSORY TO AN EXISTING AIRPORT-RELATED FACILITY.City of Philadelphia · 2016
INSTALLATION OF ONE(1) UL LISTED, 1,000 GALLON, DOUBLE-WALL ABOVE GROUND FUEL OIL STORAGE TANK (AST) WITH MONITORING SYSTEM (NOT MORE THAN TWO STORIES BELOW GRADE PLANE). SEPARATE PERMITS REQUIRED FOR ANY ASSOCIATED ELECTRICAL WORK AND FOR INSTALLATION OF FIRE SUPPRESSION SYSTEM AT FUEL OIL STORAGE ROOM. ALL WORK TO BE PERFORMED BY A DEP CERTIFIED CONTRACTOR.City of Philadelphia · 2016
FOR THE INSTALLATION OF ONE (1) 6,000 FUEL OIL ABOVEGROUND STORAGE TANK INSIDE BUILDING AS SHOWN PER APPROVED PLANS. ALL WORK TO BE DONE IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS AND IN ACCORDANCE WITH PENNSYLVANIA D.E.P. REGULATIONS, ALL APPLICABLE CODES, NFPA 30, AND NFPA 31. APPLICANT IS REQUIRED TO SUBMIT CLOSURE REPORT TO PENNSYLVANIA D.E.P. IN ACCORDANCE WITH STATE REGULATIONS.City of Philadelphia · 2015
FOR THE REMOVAL OF FOUR (4) 25,000 GALLON #6 FUEL UNDERGROUND STORAGE TANKS AND FOUR (4) 25,000 GALLON DIESEL FUEL TANKS AS PER PLANS. ALL WORK TO BE IN ACCORDANCE WITH PA D.E.P REGULATIONS, ALL APPLICABLE CODES, NFPA 30 AND NFPA 31.City of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.