What the public permit record shows, not self-reported reviews.
Is WOODEN BOX LLC a real contractor?
WOODEN BOX LLC appears in public building-permit records with 56 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is WOODEN BOX LLC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to WOODEN BOX LLC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is WOODEN BOX LLC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. WOODEN BOX LLC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is WOODEN BOX LLC's work?
The most recent permit on record for WOODEN BOX LLC is dated 2026-03-05, with 56 permits on file in total.
One story addition to an existing detach structure for use as one-family household living. details per plans.City of Philadelphia · 2026
LEVEL II ALTERATIONS WITH PARTIAL CHANGE OF OCCUPANCY TO CREATE A SIT-DOWN RESTAURANT IN THE FIRST FLOOR AND BASEMENT OF AN EXISTING BUILDING AS PER APPROVED PLANS. SEE PERMIT SP-2025-000548 FOR ASSOCIATED EXCAVATION WORK. BASEMENT AND FIRST FLOOR TO BE SPRINKLERED. *2018 IEBC REVIEW*
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2025
FOR A ONE-STORY ADDITION WITH ROOF DECK TO AN EXISTING DETACHED STRUCTURE USED AS A SINGLE-FAMILY DWELLING AS PER BUILDING APPLICATION/PLAN.City of Philadelphia · 2025
FOR LEVEL II ALTERATIONS TO INCLUDE NEW PARTITIONS, FIXTURES, FURNISHINGS, FINISHES AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP AND FIRE SUPPRESSION WORK.City of Philadelphia · 2025
FOR ERECTION OF AN ADDITION AND COVERED PORCH TO THE SIDE OF AN EXISTING DETACHED STRUCTURE AS PER APPROVED PLAN.
*SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*City of Philadelphia · 2024
FOR LEVEL II ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, WINDOWS, PROVIDE FINISHES/FURNISHINGS. AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS AND DOCUMENTATION. SEPARATE PERMTIS TO BE OBTAINED FOR ALL OTHER WORK.
02/04/26 AMENDMENT: FOR THE LOCATION OF SELF-CONTAINED BATTERY BACKUP FOR ELECTRICAL PANEL. AS PER APPROVED PLANS.City of Philadelphia · 2024
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you WOODEN BOX LLC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
FOR THE INSTALLATION OF ONE (1) COMMERCIAL KITCHEN EXHAUST HOOD TYPE 1 PER APPROVED PLAN.City of Philadelphia · 2024
For the demolition of the existing carport roof. For the erection of an addition and for interior alterations to an existing attached single-family dwelling per plans. Separate permits are required for all associated Mechanical, Electrical, and Plumbing work. Basement to remain non-habitable, to be used for storage and utilities only.City of Philadelphia · 2023
One story addition to existing building per plans. NO EXCAVATIONS PROPOSED LOWER THAN 5 FT. RECORDED DEED MUST BE OBTAINED PRIOR TO THE CLOSE OF THIS BUILDING PERMIT AS PART OF THE CONDITION OF THE ZONING PERMIT # ZP-2023-002695City of Philadelphia · 2023
FOR THE CONSTRUCTION OF AN ADDITION ABOVE AND TO THE SIDE OF AN EXISTING DETACHED STRUCTURE AND THE ERECTION OF A ROOF DECK ABOVE AS PER APPROVED PLAN; FOR USE AS SINGLE-FAMILY HOUSEHOLD LIVING. *SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK* **UNDERPINNING IS NOT PART OF THIS PERMIT**City of Philadelphia · 2022
Second story addition with roof deck per plans. Separate permits required for all MEP work.City of Philadelphia · 2021
Interior renovation including new kitchen and finished basement per plans. no other work included in this permit. separate permit ( RP-2021-4525) issued for building addition.City of Philadelphia · 2021
Permitted projects on public record. Addresses are omitted for privacy.