What the public permit record shows, not self-reported reviews.
Is WIDNER CONSTRUCTION MANAGEMENT a real contractor?
WIDNER CONSTRUCTION MANAGEMENT appears in public building-permit records with 9 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is WIDNER CONSTRUCTION MANAGEMENT's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to WIDNER CONSTRUCTION MANAGEMENT by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is WIDNER CONSTRUCTION MANAGEMENT licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. WIDNER CONSTRUCTION MANAGEMENT has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is WIDNER CONSTRUCTION MANAGEMENT's work?
The most recent permit on record for WIDNER CONSTRUCTION MANAGEMENT is dated 2025-06-05, with 9 permits on file in total.
FOR LEVEL II INTERIOR ALTERATIONS TO A CONCESSION STAND AND SEATING AREA (BUD NEST) ON LEVEL 6 OF AN EXISTING GROUP A-5 SPORTS STADIUM (LINCOLN FINANCIAL FIELD). ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IEBC. EXISTING BUILDING IS FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING, AND FIRE SUPPRESSION WORK. IF SITE CONDITIONS VARY, CONTACT DESIGN PROFESSIONAL PRIOR TO START OF WORK.City of Philadelphia · 2025
LEVEL II ALTERATIONS (NO CHANGE OF OCCUPANCY) FOR RENOVATIONS TO EXISTING EXTERIOR SPORTS STADIUM TO REPLACE CONCRETE SEATING SECTIONS WITH REMOVABLE STEEL SEATING SECTIONS AS PER APPROVED PLANS. NO CHANGE TO SEATING LAYOUT, NUMBER OF SEATS OR MEANS OF EGRESS. *2018 IEBC REVIEW*City of Philadelphia · 2024
FOR THE ERECTION OF A DETACHED BUILDING (ONE STORY TRAILER) AS A PART OF PHILADELPHIA INTERNATIONAL AIRPORT AS PER APPROVED PLANS. SEPARATE PERMITS REQUIRED FOR MEP WORK. BUILDING IS NOT SPRINKLERED.City of Philadelphia · 2023
FOR THE ERECTION OF 14 AUGER CAST PILES. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. ALL FUTURE BEAMS, GIRDERS, POSTS, AND CONNECTIONS TO THE FUTURE PREFABRICATED TRAILER REQUIRE A SEPARATE BUILDING PERMIT.
AMENDMENT APPROVED AS OF 8/11/23:
TO DOCUMENT THE CHANGE IN AUGER CAST PILES. SIZE AND LOCATION AS SHOWN IN AMENDENT PLANS.City of Philadelphia · 2023
FOR THE ERECTION AND INSTALLATION OF AN HYDROGEN FUELING STATION AT THE LINCOLN FINANCIAL FIELD, PER THE APPROVED PLAN, DOCUMENTS, AND SPECS. IF FIELD CONDITIONS VARY, CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.
ELECTRICAL: Install (1) 55 KVA transformer, (1) 277 volt 20A feeder for station heater, (1) 100 amp 3-phase disconnect, provide grounding of transformer pad, and provide heat trace as per 2017 NEC. Install fire alarm devices as per 2016 NFPA 72.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you WIDNER CONSTRUCTION MANAGEMENT?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to WIDNER CONSTRUCTION MANAGEMENT's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
ALTERATION TO INCLUDE NEW GUARDRAILS AS PER THE APPROVED PLANS.City of Philadelphia · 2022
FOR LEVEL II ALTERATIONS TO AN EXISTING BUILDING FOR THE CONVERSION OF AN EXISTING ACCESSORY MAINTENANCE OFFICE (LESS THAN 10% OF FLOOR AREA) IN TO RESIDENTIAL UNIT FOR A NEW TOTAL OF TWENTY FOUR (24) UNITS THROUGHOUT THE BUILDING. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND FURNISHINGS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2022
LEVEL II INTERIOR ALTERATION ( NO CHANGE IN OCCUPANCY) IN AN EXISTING STRUCTURE. ALTERATION TO INCLUDE THE ERECTION O F A NEW MEZZANINE AND THE INTERIOR FIT-OUT OF A NEW VIP CLUB ON THE SERVICE LEVEL OF LINCOLN FINANCIAL FIELD. THE NEW CLUB INCLUDES A NEW ENTRANCE, BAR, FULL COMMERCIAL KITCHEN, EXTENSION OF AN EXISTING EGRESS STAIR FROM THE THE MAIN CONCOURSE LEVEL TO THE SERVICE LEVEL AND THE NEW MEZZANINE, AND A SECOND STAIR FROM THE SERVICE LEVEL TO THE MEZZANINE WITH A PROVIDED ADA PLATFORM LIFT.** STRUCTURE TO BE FULLY SPRINKLERED**IEBC 2018** SEPARATE PERMITS REQUIRED FOR ANY MECHANICAL ELECTRICAL AND PLUMBING WORK**
AMENDENDED AS OF 12/22/2020 FOR THE RELOCATION OF THE PLATFORM LIFT FROM STAIRS 13.1 TO STIRS 13 AND FOR SOME MINOR STRUCTURAL MODIFICATION AS PER APPROVED PLANS.**NO SIGN APPROVED ON THIS PERMIT**City of Philadelphia · 2020
FOR LEVEL II ALTERATIONS TO AN EXISTING CAFETERIA, ALTERATIONS TO MODIFY LAYOUT TO INCLUDE REPLACEMENT OF EQUIPMENT AND PROVIDE FINISHES AND FURNISHING THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION WORK.City of Philadelphia · 2015
Permitted projects on public record. Addresses are omitted for privacy.