What the public permit record shows, not self-reported reviews.
Is WEST CHESTER MECHANICAL CONTRACTORS INC a real contractor?
WEST CHESTER MECHANICAL CONTRACTORS INC appears in public building-permit records with 227 permits filed through 2026 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is WEST CHESTER MECHANICAL CONTRACTORS INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to WEST CHESTER MECHANICAL CONTRACTORS INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is WEST CHESTER MECHANICAL CONTRACTORS INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. WEST CHESTER MECHANICAL CONTRACTORS INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is WEST CHESTER MECHANICAL CONTRACTORS INC's work?
The most recent permit on record for WEST CHESTER MECHANICAL CONTRACTORS INC is dated 2026-05-22, with 227 permits on file in total.
FOR A MECHANICAL SYSTEM UPGRADE. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. **ALL WORK TO BE DONE PER APPROVED PLANS.** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.**City of Philadelphia · 2026
FOR THE INSTALLATION OF HVAC EQUIPMENT PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS.City of Philadelphia · 2026
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2026
FOR A MECHANICAL SYSTEM UPGRADE. **ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **City of Philadelphia · 2026
New sink and new sanitary and domestic water ALL WORK PERFORMED IN STRICT COMPLIANCE WITH 2018 PPC AND PLUMBING EZ STANDARD.City of Philadelphia · 2026
FOR THE INSTALLATION OF ONE (1) SPLIT-SYSTEM HVAC APPLIANCE, RELOCATED AND NEW GRDs, AND ASSOCIATED DUCTWORK. ALL WORK TO BE DONE PER APPROVED PLANS AND IN ACCORDANCE WITH PHC AND PA DOH APPROVALS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-000663 FOR ASSOCIATED BUILDING PERMIT.City of Philadelphia · 2026
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you WEST CHESTER MECHANICAL CONTRACTORS INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to WEST CHESTER MECHANICAL CONTRACTORS INC's website. It links to this profile so homeowners can see the public permit record behind your work.
FOR THE REMOVAL AND REPLACEMENT OF TWO (2) HVAC APPLIANCES (PTAC UNITS) AND THE RELOCATION OF ONE (1) DIFFUSER AS PER APPROVED PLANS AND IN ACCORDANCE WITH 2018 IMC AND PHC AND PA DOH APPROVALS. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK. SEE CP-2026-000622 FOR ASSOCIATED BUILDING PERMIT.City of Philadelphia · 2026
FOR THE INSTALLATION OF HVAC APPLIANCES, EQUIPMENT, DUCTWORK AND REGISTERS/DIFFUSERS PER APPROVED PLANS AND MANUFACTURER'S SPECIFICATIONS. *2018 IMC REVIEW*City of Philadelphia · 2026
Demo and install New plumbing fixtures (1) WC, (2) Lav, (3) Sink, (1) FD, (1) Ice Machine, (2) Wall Boxes, (1) Ejector Pump,City of Philadelphia · 2026
FOR THE INSTALLATION OF REGISTERS / DIFFUSERS TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. FOR USE AS PREVIOUSLY APPROVED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.City of Philadelphia · 2025
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2025
For installation of a new gas fired steam boiler.City of Philadelphia · 2025
Permitted projects on public record. Addresses are omitted for privacy.