What the public permit record shows, not self-reported reviews.
Is WARREN F DELONG INC a real contractor?
WARREN F DELONG INC appears in public building-permit records with 35 permits filed through 2016 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is WARREN F DELONG INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to WARREN F DELONG INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is WARREN F DELONG INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. WARREN F DELONG INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is WARREN F DELONG INC's work?
The most recent permit on record for WARREN F DELONG INC is dated 2016-10-12, with 35 permits on file in total.
FOR THE REMOVAL OF THREE (3) 6,000 GALLON ABOVE GROUND TANKS (AGT) AND FOR THE INSTALLATION OF TWO UNDER GROUND TANKS (UGT'S), ONE(1) 12,000 GALLON REGULAR GASOLINE TANK AND ONE (1) 4,000 GALLON PREMIUM GASOLINE TANK WITH MONITORING AND PIPING. ALL WORK TO BE DONE IN ACCORDANCE WITH MANUFACTURER SPECIFICATIONS, PENNSYLVANIA D.E.P. REGULATIONS, ALL APPLICABLE CODES, NFPA 30 AND NFPA 31.City of Philadelphia · 2016
FOR THE INSTALLATION OF AN ABOVE-GROUND DIESEL FUEL STORAGE TANK OUTSIDE OF EXISTING BUILDINGS TO SERVE TRUCKING & TRANSPORTATION TERMINAL. TANK INSTALLATION TO BE IN ACCORDANCE WITH THE PHILADELPHIA FIRE CODE, PA DEP REGULATIONS & APPLICABLE PROVISIONS OF NFPA 30.City of Philadelphia · 2016
FOR THE INSTALLATION OF ONE (1) UNDERGROUND DOUBLE-WALL STEEL 5,000 GALLON #2 FUEL TANK, TO INCLUDE NEW TWO (2)-HOUR FIRE-RATED SHAFT WALL ENCLOSURES, TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND TO CONFORM TO THE PROVISIONS OF NFPA STANDARD 30, 31, AND 704. CERTIFICATION OF COMPLETION OF INSTALLATION FROM LICENSED CONTRACTOR TO BE SUBMITTED UPON COMPLETION OF INSTALLATION INDICATING FULL COMPLIANCE WITH APPLICABLE CODES, STANDARDS, AND MANUFACTURER'S INSTALLATION INSTRUCTIONS. **SEPARATE ELECTRICAL PERMIT TO BE REQUIRED.**City of Philadelphia · 2016
THREE (3) TANK REMOVALS:
PERFORM A CONFIRMATORY SOIL SAMPLING OF SURROUNDING SOIL. CONTIGENCY PLAN IN PLACE IN THE CASE CONTAMINATED SOILS DISCOVERED.
ALL WORK COMPLETED IN ACCORDANCE WITH PADEP UST REMOVAL GUIDELINES.
EPA CERTIFICATION & CLOSURE REPORT TO BE SUBMITTED TO INSPECTOR.City of Philadelphia · 2016
FOR THE INSTALLATION OF ONE (1) 10,000 GALLON (FUEL OIL TANK) BELOW GROUND STORAGE TANK. ALL WORK TO BE IN ACCORDANCE WITH PENNSYLVANIA D.E.P IN ACCORDANCE WITH STATE REGULATIONS, ALL APPLICABLE CODES, NFPA 30, AND NFPA 31.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you WARREN F DELONG INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to WARREN F DELONG INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2015
REMOVAL AND DISPOSAL OF ANUST IN PARKING LOTCity of Philadelphia · 2014
REMOVE 4 UNDERGORUND TANKSCity of Philadelphia · 2014
INSTALLATION OF ONE - 12,000 GALLON DOUBLEWALL COMPARTMENTED UNDERGROUND GASOLINE TANK AND ONE - 15,000 GALLON DOUBLE WALL UNDERGROUND GASOLINE TANK; REMOVE EXISTING DISPENSERS AND EQUIPMENT; INSTALL FOUR (4) NEW ISLAND DISPENSERS AS PER PLANS. ALL WORK TO BE IN ACCORDANCE WITH PENNSYLVANIA D.E.P. REGULATIONS, ALL APPLICABLE CODES, NFPA 30 AND NFPA 31.City of Philadelphia · 2013
FOR THE INSTALLATION OF BOLLARDS WITH FOUNDATION & CONCRETE SLAB FOR A FUEL PUMP STATION. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS.City of Philadelphia · 2013
FOR THE REMOVAL AND REPLACEMENT OF FIVE (5) DISPENSERS AND ISLANDS. WORK TO ALSO INCLUDE AND THE REMOVAL AND REPLACMENT OF TWO (2) SUBMERSIBLE PUMPS. ALL WORK TO BE DONE PER APPROVED PLANS AND MANUFACTURER INSTALLATION SPECIFICATIONS. SEPARATE PERMITS REQUIRED FOR ANY ALTERATIONS FALLING OUTSIDE THE SCOPE OF APPROVED PLANS.City of Philadelphia · 2013
FOR THE REMOVAL AND REINSTALLATION OF TWO (2) EXISTING TANKS USED FOR ETHANOL- SAME EQUIP SAME LOCATION. ALL WORK TO BE IN ACCORDANCE WITH PENNSYLVANIA D.E.P. REGUALTIONS, ALL APPLICABLE CODES, NFPA 30, AND NFPA 31.City of Philadelphia · 2013
EXCAVATION, OPENING, CLEANING AND REMOVAL OF A 1,000 GALLON HEATING OIL UST WITH POST EXCAVATION SOIL SAMPLING.
PERFORM A CONFIRMATORY SOIL SAMPLING OF SURROUNDING SOIL. CONTIGENCY PLAN IN PLACE IN THE CASE CONTAMINATED SOILS DISCOVERED.
ALL WORK COMPLETED IN ACCORDANCE WITH PADEP UST REMOVAL GUIDELINES.
EPA CERTIFICATION & CLOSURE REPORT TO BE SUBMITTED TO INSPECTOR.City of Philadelphia · 2013
Permitted projects on public record. Addresses are omitted for privacy.