What the public permit record shows, not self-reported reviews.
Is VICTOR SAEZ a real contractor?
VICTOR SAEZ appears in public building-permit records with 68 permits filed through 2025 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is VICTOR SAEZ's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to VICTOR SAEZ by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is VICTOR SAEZ licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. VICTOR SAEZ has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is VICTOR SAEZ's work?
The most recent permit on record for VICTOR SAEZ is dated 2025-07-15, with 68 permits on file in total.
Install 3 gang meter to add a 100 amp house panel.City of Philadelphia · 2025
nstall 200 amp electrical service, install wiring throughout, install lighting, switches, receptacles smoke and co detector as per 2017 necCity of Philadelphia · 2025
Install 200 amp electrical service, install wiring throughout, switches, receptacle, smokes, co, finish electrical, as per 2017 N.E.CCity of Philadelphia · 2025
Install wiring throughout, rough and finish for electrical, install 200 amp electrical service as per 2017 NECCity of Philadelphia · 2025
Install wiring throughout. install lighting, switches, receptacle, fishing wire in existing location, smoke and co detector, finish electrical, as per 2017 NEC
AMENDMENT: INSTALL 200 AMP ELECTRICAL WITH CIRCUIT BREAKER PANEL ACCORDING TO THE 2017 NEC.City of Philadelphia · 2025
Install 100 amp service, install wiring throughout all recepts to be gfci. PER:
210.8(A) Dwelling Unit
All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(A)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel.
Bathrooms
Garages, and also accessory buildings that have a floor located at or below grade level not intended as habitable rooms and limited to storage areas, work areas, and areas of similar use-2017 NEC.City of Philadelphia · 2025
INSTALL A 400 AMP SERVICE, (3) GANG METER BANK, (1) 200 AMP PANEL & FEEDER, (1) 125 AMP PANEL & FEEDER, (1) 100 AMP PANEL & FEEDER. INSTALL WIRING THROUGHOUT THE COMMON AREAS , COMMERCIAL SPACE & ONE DWELLING UNIT. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, RECEPTACLE, & SMOKE ALARMS. PROVIDE POWER FOR THE MECHANICAL & HVAC EQUIPMENT. INSTALL A NEW FIRE ALARM SYSTEM THROUGHOUT. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you VICTOR SAEZ?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.