What the public permit record shows, not self-reported reviews.
Is VENCIO DESIGN AND BUILD INC a real contractor?
VENCIO DESIGN AND BUILD INC appears in public building-permit records with 10 permits filed through 2016 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is VENCIO DESIGN AND BUILD INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to VENCIO DESIGN AND BUILD INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is VENCIO DESIGN AND BUILD INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. VENCIO DESIGN AND BUILD INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is VENCIO DESIGN AND BUILD INC's work?
The most recent permit on record for VENCIO DESIGN AND BUILD INC is dated 2016-04-22, with 10 permits on file in total.
REPLACE WINDOWS INTO EXISTING OPENING AND STUCCO FRONTCity of Philadelphia · 2016
INTERIOR RENOVATIONS PER PLANS.City of Philadelphia · 2016
*ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK* FOR THE DEMOLITION AND ERECTION OF INTERIOR PARTITIONS, ACCESSIBILITY UPGRADES, AND MILLWORK. SPACE TO BE USED AS A DAY CARE FACILITY. TWO MEANS OF EGRESS PROVIDED FROM EACH CLASSROOM, EGRESS THROUGH ADJOINING SPACES MUST BE ACCESSORY TO CLASSROOM AND EXIT ACCESS SHALL NOT PASS THROUGH A ROOM THAT CAN BE LOCKED. STRUCTURE IS FULLY SPRINKLERED. SEPARATE PERMITS REQUIRED FOR FIRE SUPPRESSION, MECHANICAL, ELECTRICAL, AND PLUMBING.City of Philadelphia · 2015
LEVEL II INTERIOR ALTERATIONS TO INCLUDE PARTIAL CHANGE OF OCCUPANCY TO CREATE A GROUP MEDICAL/HEALTH PRACTITIONER'S OFFICE (DIALYSIS CENTER) IN GROUND FLOOR SUITE B (AKA UNIT 7) IN AN EXISTING MULTISTORY MEDICAL OFFICE BUILDING AS PER APPROVED PLANS. EXISTING BUILDING FULLY SPRINKLERED.
**SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**City of Philadelphia · 2015
3500 SQUARE FEET, INTERIOR DEMOLITION OF NON LOAD BEARING WALLS AND CEILINGS ONLY. NO OTHER WORK ALLOWED UNDER THIS PERMIT.
NO STRUCTURAL CHANGES. MUST MAINTAIN ALL CODE REQUIRED FIRE RATING ON WALL AND FLOOR/CEILING ASSEMBLIES.
THREE SETS OF PLANS DRAWN TO PROFESSIONAL QUALITY ARE TO BE SUBMITTED FOR REVIEW AND APPROVAL BY THE DEPARTMENT BEFORE WORK ON RENOVATION STARTS.
CONTACT STREETS DEPARTMENT FOR DUMPSTER PERMIT AND FOOTWAY CLOSURE PERMITS.City of Philadelphia · 2014
1000 SQUARE FEET OF INTERIOR ALTERATIONS - SINGLE FAMILY DWELLING - APPLICANT AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, DATED JAN 2011. DEVIATIONS FROM THIS STANDARD WILL RESULT IN THE REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES. LICENSED CONTRACTOR TO BE LISTED ON PERMIT
SEPARATE PERMITS REQUIRED FOR PLUMBING, ELECTRIC AND HVAC.
CALL INSPECTOR AT DISTRICT OFFICE AT LEAST 24 HOURS PRIOR TO STARTING WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you VENCIO DESIGN AND BUILD INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Add this Permit-Verified badge to VENCIO DESIGN AND BUILD INC's website. It links to this profile so homeowners can see the public permit record behind your work.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2014
REDUCTION OF USE TO A SINGLE FAMILY DWELLING.City of Philadelphia · 2014
TCO FOR PERMIT 505813,2ND FLOOR DAYCARECity of Philadelphia · 2014
90 DAY TCO FOR AP# 505819City of Philadelphia · 2014
INTERIOR ALTERATIONS TO CREATE ADMINSTRATIVE OFFICES FOR A HEALTH CARE CENTER ON THE GROUND FLOOR OF AN EXISTING BUILDING. ALTERATIONS INCLUDE ROOM CONFIGURATIONS, EMPLOYEE & PATIENT SERVICE AREAS, WAITING ROOMS AND OFFICES. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL AND FIRE SUPPRESSION SYSTEMS. **ALL ASBESTOS TO BE TREATED/REMOVED PRIOR TO COMMENCEMENT OF WORK.**City of Philadelphia · 2013
Permitted projects on public record. Addresses are omitted for privacy.