Replace existing Automatic Transfer Switch serving the Verizon Business suites within this building, with a new unit as per 2017 NEC.City of Philadelphia · 2026
Electrical Permit for combo CP-2025-004190City of Philadelphia · 2026
Upgrade HVAC system and associated equipment, including disconnects, conduit runs, electrical panels, wiring, control wiring, and grounding as per 2017 NEC. ***NOT APPROVED FOR FIRE ALARM INSTALLATION***City of Philadelphia · 2025
Provide a Portable Generator Connection Box and electrical feeder tie in to the Verizon Business Distribution System. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2024
The complete scope of work is on page WC-0.0 of the plans (attached).
1. THIS DOCUMENT INDICATES THE DETAILED DESIGN TO REPLACE A DAMAGED 3000A BUSWAY BETWEEN THE VZ ATS LOCATED ON THE ROOF AND THE VZ MAIN DISTRIBUTION SWITCHBOARD ON THE 3RD FLOOR. THE DAMAGED BUSWAY WILL BE REPLACED ENTIRELY WITH A NEW 1600A CIRCUIT, WIRE IN CONDUIT. THIS NEW 1600A CIRCUIT WILL SERVE ALL LOADS ON THE VZ ELECTRICAL SYSTEM VIA SWITCHBOARD "DB-1" EXCEPT FOR THE VZ ELECTRICAL PANELS ON THE ROOF WHICH SHALL REMAIN TAPPED FROM THE EXISTING VZ ATS LOAD BUS.
2. TO FACILITATE INSTALLATION OF THE NEW 1600A CIRCUIT WITHOUT COMPROMISING SITE OPERATIONS, NEW TEMPORARY POWER DISTRIBUTION EQUIPMENT WILL BE INSTALLED AT THIS FACILITY. NEW TEMPORARY POWER DISTRIBUTION EQUIPMENT SHALL INCLUDE A NEW 1200A TEMPORARY GENERATOR CONNECTION BOX WITH OVERCURRENT PROTECTION AND A NEW DUAL-FEED 1200A DISTRIBUTION PANEL DESIGNATED PANEL "E". THIS NEW EQUIPMENT SHALL REMAIN FOR FUTURE USE AS AN ALTERNATE EMERGENCY POWER SOURCE FOR THE VERIZON SYSTEM, SHOULD THE NEED ARISE. THUS, A NEW 1200A CIRCUIT CONNECTING PANEL "E" TO SWITCHBOARD "DB-1" SHALL BE PROVIDED FOR FUTURE USE. THIS NEW CIRCUIT WILL BE TERMINATED AT AN EXISTING BREAKER IN "DB-1", ALLOWING PANEL "E" TO BACKFEED SWITCHBOARD "DB-1".
3. CONNECTION OF CIRCUITS TO BOTH THE EXISTING ATS AND SWITCHBOARD "DB-1" WILL NEED TO BE PERFORMED UNDER GOVERNANCE OF AN APPROVED MOP. PREP WORK FOR THIS MOP WILL INCLUDE INSTALLATION OF THE NEW WIRE IN CONDUIT WITH WIRE COILED FOR FINAL TERMINATION DURING THE MOP. PREP WORK SHALL ALSO INCLUDE INSTALLATION OF ALL NEW TEMPORARY POWER DISTRIBUTION EQUIPMENT AND TEMPORARY CIRCUITS FOR THE MOP. DURING THE MOP, PANEL "E" SHALL BE ENERGIZED BY A TEMPORARY CIRCUIT FROM THE EXISTING VZ STANDBY GENERATOR, WITH A TEMPORARY GENERATOR CONNECTED AS A BACKUP SOURCE. POWER SUPPLY TO SWITCHBOARDS "DP-2", "DP-3", AND PANEL "HA" SHALL BE TRANSFERRED TO TEMPORARY CIRCUITS FROM PANEL "E". THE VZ ATS WILL THEN BE DE-ENERGIZED AND
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2024
INSTALL (2) 300 KVA TRANSFORMERS, (1) 30 KVA TRANSFORMER, (2) 1000 AMP PANEL BOARDS. INSTALL (4) 600 AMP OVERHEAD BUSS DUCT RUNS. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, RECEPTACLES IN THE NETWORKING ROOM. PROVIDE POWER FOR THE MECHANICAL & HVAC EQUIPMENT. PROVIDE POWER FOR THE UPS & NETWORK EQUIPMENT. INSTALL NEW VESDA FIRE DETECTION DEVICES & EQUIPMENT.
ALL WORK IN ACCORDANCE WITH THE 2017 NEC.City of Philadelphia · 2024
Provide a temporary portable generator to provide emergency standby power and related wiring. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC.City of Philadelphia · 2023
Provide power, annunciation, and detection system wiring for suppression system replacement in the main electrical room as per APPROVED DRAWINGS-2016 NFPA-72,2018 PHILA FIRE CODE.
-FP-2023-000181-City of Philadelphia · 2023
Electrical Permit for combo CP-2022-002800
Amend Permit 3/9/2023 - Electrical work associated with - Remove (3) existing 500kW standby diesel generators and associated day tanks, underground fuel storage, and fuel system accessories. Install 2000kW standby diesel generators, a new 400-gallon ul-142 double wall day tank with return pump, new 12,000-gallon ul-2085 double wall Protected aboveground fuel storage tank and associated concrete tank pad, new duplex supply pump package, new fuel filter/polisher system, and associated fuel piping. We will also remove existing paralleling switchgear and generator switchgear and replace them with a new generator switchgear.
There is no cost change to any of the trades.City of Philadelphia · 2023
The project includes 7 new structures and 1 existing structure in the shipyard.
There are 6 new ten structures and 1 new trailer structure and 1 existing tent structure that will require new electrical systems.
A new electrical distribution system is being proposed to distribute power to the 8 structures.
There is an existing 13.2 kV underground electrical service loop in the shipyard that will be tapped to provide power to the new structures.
A 13.2kV switch will be provided to feed a 1500 kVA transformer. The 1500 kVA transformer will then feed a 2000 amp, 480/277 volt, 3 phase, 4 wire switch board (Main Switchboard).
From the Main Switchboard 200 amp feeders will be provided underground to each structure.
At each structure there will be the following:
1. 200A, 480/277 volt, 3 phase, 4 wire panel.
2. 45 kVA, 480 volt primary, 208/120 volt secondary, 3 phase, 4 wire transformer.
3. 150A, 208/120 volt, 3 phase, 4 wire panel.
In addition a duct bank will be provided for future extension of power to the south pier.
As per 2017 NEC
Fire alarm as per 2016 NFPA 72City of Philadelphia · 2021
Electrical alterations and rewiring including (6) GFCI receptacles, (25) duplex receptacles, (8) switches, (25) luminaires, and (5) smoke detectors as per 2014 necCity of Philadelphia · 2021
Electrical to new dry cooler fans, and condenser pumps as per the 2017 nec.City of Philadelphia · 2020