What the public permit record shows, not self-reported reviews.
Is URBAN CORE INC a real contractor?
URBAN CORE INC appears in public building-permit records with 20 permits filed through 2018 in and around City of Philadelphia, PA. Permits are filed with local government before work begins, so this is a matter of public record, not a self-reported listing.
How is URBAN CORE INC's track record verified?
Every figure on this page comes from building permits pulled from municipal records and matched to URBAN CORE INC by the contractor name on each permit. Permit records cannot be purchased or faked the way online reviews can, which makes them a stronger signal of real, completed work.
Is URBAN CORE INC licensed and insured?
This profile is built from permit records, which confirm permitted work but do not include license status. URBAN CORE INC has not claimed this profile to add license or insurance details. Confirm licensing directly with your state or local board before hiring.
How recent is URBAN CORE INC's work?
The most recent permit on record for URBAN CORE INC is dated 2018-03-05, with 20 permits on file in total.
TEMPORARY CERTIFICATE OF OCCUPANCY FOR UNITS 2F AND 2RCity of Philadelphia · 2018
TEMPORARY CERTIFICATE OF OCCUPANCY FOR 2ND AND 3RD FLOOR UNITSCity of Philadelphia · 2018
FOR THE AMENDMENT OF AP#703398 TO DOCUMENT THE REMOVAL OF THE PROPOSED SPRINKLER SYSTEM AND FOR THE INSTALLATION OF A FIRE RATED DOOR TO ENSURE EXISTING EXIT ENCLOSURE (STAIR#1) LEADS DIRECTLY TO THE EXTERIOR OF THE BUILDING. ORIGINAL PERMIT APPROVED FOR LEVEL II ALTERATIONS TO AN EXISTING BUILDING FOR USE AS BUSINESS AND PROFESSIONAL OFFICE IN EACH TENANT SPACE. WORK TO ALSO INCLUDE THE ERECTION OF AN EXIT ENCLOSURE AND AN ELEVATOR TO PROVIDE AN ACCESSIBLE ROUTE TO THE PRIMARY FUNCTION AREA. BUILDING IS NOT SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. AMENDED PERMIT REQUIRED FOR SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR A CERTIFICATE OF OCCUPANCY FOR EACH SPACE, MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2017
TEMPORARY CERTIFICATE OF OCCUPANCY FOR:1ST FLOOR- BUSINESS SPACE #2 (102), 2ND FLOOR- BUSINESS SPACE # 6 (201), #2 (202), #1 (203), #7 (204) , 3RD FLOOR-BUSINESS SPACE # 3 (301), #2 (302), #1 (303), #4 (204)City of Philadelphia · 2017
FOR THE AMENDMENT OF AP#706802 FOR DOCUMENTATION OF NEW EXTERIOR OPENINGS AT THE NORTH WALL TO PERMIT EGRESS ALONG THE ACCESS EASEMENT, WITH THE RECONFIGURATION OF THE PROPOSED ACCESS PILOT HOUSES.City of Philadelphia · 2017
FOR THE ERECTION OF AN ADDITION, ROOF DECK ACCESS STRUCTURE, ROOF DECK, INTERIOR ALTERATIONS, AND ALL OTHER WORK AS PER APPROVED PLANS. ENTIRE BULDING TO BE FULLY SPRINKLERED. SEPARATE PERMIT REQUIRED FOR ANY MEP WORK AND FIRE SUPPRESSION WORK.
Republishing these numbers? A link back is all we ask — one click copies a ready credit you can paste into any post.
Are you URBAN CORE INC?
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2017
FOR THE AMENDMENT OF PREVIOUSLY APPROVED BUILDING PERMIT#703398 TO INCLUDE REVISED CONCRETE SLAB PLAN FOR GROUND LEVEL FLOOR SPACE. ORIGINAL PERMIT APPROVED FOR LEVEL II ALTERATIONS TO AN EXISTING BUILDING FOR USE AS BUSINESS AND PROFESSIONAL OFFICE IN EACH TENANT SPACE. WORK TO ALSO INCLUDE THE ERECTION OF AN EXIT ENCLOSURE AND AN ELEVATOR TO PROVIDE AN ACCESSIBLE ROUTE TO THE PRIMARY FUNCTION AREA. BUILDING IS NOT FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. AMENDED PERMIT REQUIRED FOR SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR A CERTIFICATE OF OCCUPANCY FOR EACH SPACE, MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2017
FOUNDATION ONLY FOR NEW FRONT ADDITION AS PART OF RENOVATION/ADDITION TO AN EXISTING BUILDING AS PER APPROVED PLANS. *SEPARATE PERMIT REQUIRED FOR ALTERATIONS AND ADDITION WORK*City of Philadelphia · 2017
FOR LEVEL II ALTERATIONS TO A SPACE FOR USE A TAKE OUT RESTAURANT, ALTERATIONS TO INLCUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES AND PROVIDE ACCESSIBILITY IMPROVEMENTS THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.City of Philadelphia · 2016
FOR THE AMENDMENT OF AP#703398 TO INCLUDE RENOVATION TO PROPOSED BATHROOMS ON FIRST THROUGH THIRD FLOOR LEVEL. ORIGINAL PERMIT APPROVED FOR FOR LEVEL II ALTERATIONS TO AN EXISTING BUILDING FOR USE AS BUSINESS AND PROFESSIONAL OFFICE IN EACH TENANT SPACE. WORK TO ALSO INCLUDE THE ERECTION OF AN EXIT ENCLOSURE AND AN ELEVATOR TO PROVIDE AN ACCESSIBLE ROUTE TO THE PRIMARY FUNCTION AREA. BUILDING IS NOT FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. AMENDED PERMIT REQUIRED FOR SPECIAL INSPECTIONS. SEPARATE PERMITS REQUIRED FOR A CERTIFICATE OF OCCUPANCY FOR EACH SPACE, MECHANICAL, ELECTRICAL AND PLUMBING WORK.City of Philadelphia · 2016
INTERIOR DEMOLITION OF NON LOAD BEARING WALLS AND FLOORING, INSTALLATION OF INTERIOR PARTITION WALLS, REPAIR/REPLACEMENT OF STUCCO, AND ROOF REPAIRS-EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.City of Philadelphia · 2016
FOR THE AMENDMENT OF PERMIT AP#706802 TO REVISE FOUNDATION DESIGN CONFIGURATION AT SOUTH WALL WITH PROPOSED UNDERPINNING INSTALLATION AND PREFABRICATED EGRESS WELL, AND REVISED ASSEMBLY LISTINGS FOR RATED FLOOR/CEILING ASSEMBLIES. **PER CODE BULLETIN B-0702, WRITTEN NOTICE SHALL BE PROVIDED TO THE OWNERS OF THE ADJOINING PROPERTY ADVISING THEM THAT THE EXCAVATION IS TO BE MADE AND THAT ADJOINING BUILDINGS SHOULD BE PROTECTED, TO BE DELIVERED NOT LESS THAN TEN (10) DAYS PRIOR TO THE SCHEDULED START DATE OF THE EXCAVATION. APPROVAL OF CONSTRUCTION PLANS DOES NOT BESTOW ANY RIGHT TO ENTER UPON OR DISTURB THE ADJOINING PROPERTY WITHOUT THAT OWNER'S PERMISSION.**City of Philadelphia · 2016
Permitted projects on public record. Addresses are omitted for privacy.