Installation of solar array in accordance with signed standard.City of Philadelphia · 2023
Installation of solar array in accordance with signed standard.City of Philadelphia · 2023
Installation of solar array in accordance with signed standard.City of Philadelphia · 2023
Ev charger ( level 2) installation in the garage, safety Fused disconnect as per 2017 NEC. Approximately 100 feet away from the meter bank, the indoor garage stall of unit -10. Plans and approximate locations were submitted along contract. Building Asociation Approved the installation. Surface mount EMT conduit. Not interior wiring, its addition of an outlet for ev charger. there was no such option.City of Philadelphia · 2023
INSTALLATION OF 10 KW SYSTEM OF 25 ROOF MOUNTED SOLAR ARRAYS AS PER 2017 NECCity of Philadelphia · 2023
-Replacing existing 100 A service wire, 100 A meter box, 100 A Electrical panel to 200A equipment respectively as per 2017 necCity of Philadelphia · 2022
Installation of solar array in accordance with signed standard.City of Philadelphia · 2022
Installation of solar array in accordance with signed standard.
This profile was built from public permit records. Claim it free to add your photo, phone, and website, so the homeowners landing here can actually reach you.
Track record sourced from public building-permit records. Figures reflect permitted projects, not self-reported work. Listed on Proven Pros.
City of Philadelphia · 2022
Installation of solar array in accordance with signed standard.City of Philadelphia · 2022
Installation of solar array in accordance with signed standard.City of Philadelphia · 2022
Electrical Service Upgrade: Replacing existing 100A - meter socket, electrical panel, service drop to 200A equipment respectively. AS PER 2014 NEC.City of Philadelphia · 2022
RE-WIRE ONE FAMILY DWELLING AS PER 2008 NECCity of Philadelphia · 2017
Permitted projects on public record. Addresses are omitted for privacy.